DISCUSSION DRAFT. -FOR THE PURPOSES OF INITIAL DISCUSSION, NOT <br /> PROPOSED FOR ACCEPTANCE <br /> 5. The groundwater in Coburg and the area immediately surrounding Coburg has been found to <br /> be contaminated with nitrates and other human caused contaminants which, in several sampling <br /> locales, has been found at concentrations that pose a risk to health and safety, and <br /> 6. Groundwater contamination in one part of the central Lane County region represents a <br /> serious problem for all the residents of the region and has been one of the major forces leading to <br /> the development of a regional wastewater system serving portions of Lane County and Eugene <br /> and Springfield. <br /> AGREEMENTS <br /> Section 1. Effective Date <br /> A. This agreement shall become effective upon the date of the last signature of a party <br /> affixed hereto. <br /> B. Several of the obligations of this Agreement, including the undertaking to accept and <br /> treat wastewater will not become effective and binding on any party until the occurrence of <br /> several antecedent events. Where appropriate, the necessary precedent events or actions are <br /> identified with regard to each action or obligation. Upon completion of the antecedent terms <br /> and conditions of this Agreement, MWMC will begin accepting wastewater flow from the <br /> City of Coburg, and will thereafter treat and dispose of the wastewater in the manner <br /> provided by applicable law and regulations. The antecedent conditions include: <br /> - Determining a point of connection; <br /> - Coburg securing all necessary permits and approvals, including land use actions, <br /> necessary for construction of a transmission line from Coburg to the point of connection; <br /> - Coburg adoption of a sewer use ordinance which includes sewer construction standards, <br /> infiltration and inflow (UI) criteria, sewer maintenance and rehabilitation program, and <br /> an industrial pretreatment program; <br /> - Coburg adoption of SDC and sewer rate structures that include collection of costs and <br /> charges from MWMC; <br /> - Coburg developing standards and practices concerning monitoring of flows; <br /> - Coburg completing construction of the connection point and transmission line. <br /> C. The acceptance and signature of any party to this agreement does not imply or create an <br /> obligation on the part of any signatory to make any decision or to take any position with <br /> regard to a discretionary decision that the signatory maybe called upon to make during the <br /> process of Coburg securing compliance with the antecedent terms and conditions of this <br /> Agreement. <br /> Section 2. Service limited to within Urban Growth Boundaries. The agreement allows only a <br /> connection between the Coburg Collection System at a point inside the acknowledged Urban <br /> Growth Boundary (UGB) and an appropriate point within the Eugene- Springfield UGB. No <br /> party shall allow, encourage or facilitate any connection to any portion of the high pressure <br /> transmission line between that point within the Coburg UGB where the collection end of the high <br /> <br /> pressure line is established, and that point within the established Eugene-Springfield <br /> Metropolitan Area Plan UGB where the high pressure line terminates by connection to the <br /> DRAFT - IGA for Coburg - MWMC DRAFT Page 2 <br /> _ _ _ <br /> <br />