New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Coburg Connection (3)
COE
>
PW
>
Admin
>
Execs
>
Executive non-confidential
>
Historical
>
Coburg Connection (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/11/2010 9:57:08 AM
Creation date
8/6/2008 9:48:38 AM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Wastewater
PWA_Project_Area
MWMC
PW_Subject
Coburg Connection
Document_Date
9/26/2008
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
DISCUSSION DRAFT -FOR THE PURPOSES OF INITIAL DISCUSSION, NOT <br /> PROPOSED FOR ACCEPTANCE <br /> agreement, will include all pipes, pumps, pumping stations and treatment facilities located along <br /> the route that Coburg wastewater will need to travel to get from the point of connection to the <br /> MWMC treatment facility. <br /> Point of connection. The location point at which the Coburg system connects to the MWMC <br /> system, to be established by technical staff of Coburg, Eugene and MWMC. For purposes of this <br /> agreement and later analysis, the point of connection and downflow from the point of connection <br /> shall be considered a part of the regional system. <br /> <br /> DRAFT - IGA for Coburg - MWMC DRAFT Page 9 <br /> _ <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.