DISCUSSION DRAFT -FOR THE PURPOSES OF INITIAL DISCUSSION, NOT <br /> PROPOSED FOR ACCEPTANCE <br /> agreement, will include all pipes, pumps, pumping stations and treatment facilities located along <br /> the route that Coburg wastewater will need to travel to get from the point of connection to the <br /> MWMC treatment facility. <br /> Point of connection. The location point at which the Coburg system connects to the MWMC <br /> system, to be established by technical staff of Coburg, Eugene and MWMC. For purposes of this <br /> agreement and later analysis, the point of connection and downflow from the point of connection <br /> shall be considered a part of the regional system. <br /> <br /> DRAFT - IGA for Coburg - MWMC DRAFT Page 9 <br /> _ <br /> <br />