New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Coburg MWMC
COE
>
PW
>
Admin
>
Execs
>
Executive non-confidential
>
Historical
>
Coburg MWMC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/11/2010 9:57:15 AM
Creation date
8/6/2008 9:48:35 AM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Wastewater
PWA_Project_Area
MWMC
PW_Subject
Coburg Connection to MWMC
Document_Date
9/26/2008
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• Sampling, analysis, and coordination with Eugene-Springfield pretreatment <br /> programs <br /> • Participation in Pollution Management Practices Program, such as Fat, Oil and <br /> Grease and Photoprocessor programs <br /> Coburg Wet Weather Flow Management <br /> • Coburg adoption of MWMC WWFMP, including modeling assumptions, <br /> strategies and policies, maintenance of hydraulic modeling, etc. <br /> • UI control plan approved by MWMC, monitoring and reporting <br /> • Compliance with MWMC minimum standards for construction and materials, per <br /> IGA <br /> • CMOM compliance, accountability <br /> • Liabilities and enforcement under overflows, bypasses, or system failures <br /> (proportional share or other method for determination) <br /> • MWMC ability to enforce standards for Coburg <br /> • Interruptability for MWMC wet weather control (system detention/storage) <br /> Coburg Temperature Management Plan-TMDL/Waste Load Allocation <br /> Compliance <br /> • Compliance with MWMC TMP <br /> • Impact assessment and determination of Coburg requirements for temperature <br /> reduction, or determination of Coburg share of costs associated with MWMC <br /> temperature mitigation approach (removal and reuse of a minimum of 10 mgd to <br /> 30 mgd of plant effluent)-(involves technical review and public policy <br /> discussion about average cost vs incremental/marginal cost method of <br /> determining) <br /> • Interruptability for MWMC temperature/thermal load violation avoidance <br /> <br /> Coburg Mass Load Limits <br /> • Waste load assessment and impact on MWMC mass limitations and construction <br /> timelines/costs to address mass constraints at the WPCF <br /> <br /> Coburg Ammonia Limits <br /> • Waste load assessment and impact on MWMC mass limitations and construction <br /> timelines/costs to address ammonia constraints at the WPCF <br /> <br /> Other Potential Pollutants of Concern <br /> • Wastewater characteristics and potential impacts regarding all pollutants of <br /> concern <br /> • Mercury Pollution Management Practices and, ultimately, TMDL compliance <br /> Page 2 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.