New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Coburg MWMC
COE
>
PW
>
Admin
>
Execs
>
Executive non-confidential
>
Historical
>
Coburg MWMC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/11/2010 9:57:15 AM
Creation date
8/6/2008 9:48:35 AM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Wastewater
PWA_Project_Area
MWMC
PW_Subject
Coburg Connection to MWMC
Document_Date
9/26/2008
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
COREY Kurt A <br /> From: SMITH Susan <br /> Sent: Thursday, July 15, 2004 11:18 AM <br /> To: COREY Kurt A; PERKINS MaryBeth; KELLY Mike <br /> Cc: TAYLOR Dennis M; RUFFIER Peter J; VANVACTOR William A; BROWN Dan; LEIKEN Sid; <br /> MOTT Gregory <br /> Subject: First Cut at Coburg Issues <br /> COBURG SEWER <br /> :TENSION EVALUAT <br /> Hi. Peter, MaryBeth, and I met on Monday to begin to generate a list of <br /> issues for review by the elected officials in determining whether and how to move forward <br /> with studying a Coburg connection. Greg Mott also provided some land use comments. Here <br /> is a first cut a the list. When Dan Brown gets back from vacation, we will schedule a <br /> <br /> meeting of a much broader range of staff to flesh out and refine this list. However, <br /> Jamon Kent has scheduled a meeting at 1:00 pm today at the Eugene Chamber office with• <br /> numerous State level and Coburg officials to begin to get a handle on the scope and cost <br /> of a study, so I wanted to get at least a very rough draft on the table for their <br /> information. As you can see from just our starting point list, predicting costs and time <br /> frames at this point would be beyond staff's guessing ability. <br /> Hopefully this afternoon's meeting will provide additional information to staff that will <br /> help us move a report forward to the elected officials in a timely manner. Please let me <br /> know if you have any. feedback on the preliminary list at this time. Thanks, Susie <br /> 1 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.