10. In the parties',opinions, it is not convenient Or desirable for any one of them singly - Deleted: 11 <br /> to assume or be granted the responsibility for providing sewerage within the urban . _ - - Deletes: to the projected urban <br /> growth baundary. The parties do believe that a separate commission should be service area <br /> established for that purpose. <br /> DEFINITIONS: <br /> 1. Urban Growth Boundary. The,urban. growth boundary _ is the <br /> r,~ oj'ected geographic - ' Deleted: Proiected Urban Service <br /> area within which a full range of urban services will need to be extended or provided to Area <br /> j ~ accommodate urban development as set forth in the Metro Plan Deletes: projected <br /> l ~ Deleted: service area <br /> 2. Sewer. A conduit to carry off water and wastewater. Deleted: estimated <br /> Deleted: at any future point in time <br /> 3. Sewage: The contents of a sewer. (SU~n as lsso). ~1sso General Plan, <br /> Page 12) ._.T..__... <br /> 4. Sewerage. All or part of a system used for the collection, transmission, treatment <br /> and disposal of sewage. <br /> 5. Regional Sewerage Facilities. That part of the sewerage system, as defined in <br /> Appendix "A" of this Agreement, for which a regional entity has responsibility. <br /> 6. Local Sewerage Facilities. All other publicly owned sewerage facilities withi the, _ _ - Deleted: in <br /> I Urban grOWth bOUndary. " ~ ' Deleted: projected <br /> Deleted: service area <br /> 7. etro Plan. The Eu ene/S rin field Metro olitan Area General Plan as amended _ - Deletes: Equivalent Dwemna unit. <br /> from time-t0-tlme. The average sewage load contributed <br /> by a single family dwelling. The <br /> sewage load far commercial, <br /> .Financial Plan. The Commission's 2003 Financial Plan as periodically updated industrial or other connections may <br /> pursuant to Section 3.f of this Agreement. ~ ~ be expressed in terms of equivalent <br /> dwelling units. <br /> <br /> 1 ~ Formatted _ <br /> 9. Facilities Plan. The Commission's 2004 Facilities Plan as periodically updated 'Formatted <br /> pursuant to Section 3.n of this Agreement. <br /> Formatted <br /> i <br /> AGREEMENTS: <br /> 1. Commission: The Metropolitan Wastewater Management Commission, herein <br /> referred to as Commission, is hereby established to function under the authority of this <br /> Agreement. ~ - Deleted• The commission snap <br /> replace the Metropoldan Sewer <br /> 2. General Function: The Commission shall construct, operate and maintain the Advisory Commission(MSAC) <br /> regional sewerage facilities as described in Appendix "A" of this Agreement, or as effective February 9, 1sn.q <br /> subsequently modified with the concurrence of the Governing Bodies. The Commission <br /> shall finance these facilities in accordance with,~he Commission's.FlnanClal Plan. ~ J Deleted: an adopted financing plan <br /> - Deleted: based on the financing <br /> criteria described in Appendix "B" of <br /> 3. Specific Functions: The specific functions of the Commission shall be to: tnisAgreementgrassubsequenfiy <br /> modified with the concurrence ofthe <br /> Governing Bodies. <br /> - D 1 <br /> e eted: <#>Recommend the <br /> a.Construct, maintain and operate the regional sewerage facilities. boundaries of the County Service <br /> ~ District to the Lane County <br /> Commissioners.¶ <br /> Formatted: Bullets and Numbering <br /> <br /> ! 2 <br /> (doc.93998) <br /> <br />