New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Airport New Site Facilities
COE
>
PW
>
Admin
>
Execs
>
Executive non-confidential
>
Historical
>
Airport New Site Facilities
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/11/2010 9:56:32 AM
Creation date
8/6/2008 9:48:11 AM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Airport
PWA_Project_Area
Budget
PW_Subject
Airport Improvements 2005
Document_Date
9/26/2008
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Transportation - <br /> Priority Bikeways Extend new bicycle routes and facilities, multi use paths and on-street bike <br /> .facilities to provide additional capacity, safety, and connectivity. <br /> Plan/Policy Document: TransPlan, Bicycle Master Plan <br /> Total Project Cost: $1,800,000 <br /> Royal Avenue,`Blue Heron to A- Upgrade Royal Avenue between Blue Heron and the A-Channel to 2-lane urban <br /> Channel 'facility with tum lanes, sidewalks, street lights, bike lanes, median islands, street <br /> trees and landscaping. <br /> Plan/Policy Document: TransPlan, Royal Avenue Specific Plan, Eugene <br /> Arterial/Collector Street Plan <br /> Total Project Cost: $2,200,000 <br /> Services for New Development Unspecified petitioned infrastructure improvements to support new <br /> development and respond to infrastructure needs in developing areas (typically <br /> transportation improvement projects that may include wastewater and <br /> stormwater system components). <br /> Plan/Policy Document: SDC City Code & Methodologies <br /> Total Project Cost: $2,400,000 <br /> Sidewalk Access Ramps Install sidewalk access ramps at intersection corners and other needed access <br /> locations throughout the City, including the installation of new ramps and <br /> reconstruction of existing ramps to comply with ADA and City standards. <br /> Plan/Policy Document: TransPlan Policy, ADA Regulations <br /> Total Project Cost: $120,000 <br /> Street Lighting (Arterials & Install new or upgraded street lights along arterial and collector streets based on <br /> <br /> `Collectors) priority needs. <br /> Plan/Policy Document: TransPlan <br /> Total Project Cost: $360,000 <br /> Street Lighting (Residential} install new or upgraded street lights along local streets and in residential areas. <br /> Locations are based on a priority system that incorporates crime activity, lighting <br /> needs, location and availability of power. <br /> Plan/Policy Document: Street Lighting Priority List, TransPlan <br /> Total Project Cost: $120,000 <br /> City of Eugene 2004-2009 Capital Improvement Program <br /> 5 <br /> r <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.