Transportation - <br /> Priority Bikeways Extend new bicycle routes and facilities, multi use paths and on-street bike <br /> .facilities to provide additional capacity, safety, and connectivity. <br /> Plan/Policy Document: TransPlan, Bicycle Master Plan <br /> Total Project Cost: $1,800,000 <br /> Royal Avenue,`Blue Heron to A- Upgrade Royal Avenue between Blue Heron and the A-Channel to 2-lane urban <br /> Channel 'facility with tum lanes, sidewalks, street lights, bike lanes, median islands, street <br /> trees and landscaping. <br /> Plan/Policy Document: TransPlan, Royal Avenue Specific Plan, Eugene <br /> Arterial/Collector Street Plan <br /> Total Project Cost: $2,200,000 <br /> Services for New Development Unspecified petitioned infrastructure improvements to support new <br /> development and respond to infrastructure needs in developing areas (typically <br /> transportation improvement projects that may include wastewater and <br /> stormwater system components). <br /> Plan/Policy Document: SDC City Code & Methodologies <br /> Total Project Cost: $2,400,000 <br /> Sidewalk Access Ramps Install sidewalk access ramps at intersection corners and other needed access <br /> locations throughout the City, including the installation of new ramps and <br /> reconstruction of existing ramps to comply with ADA and City standards. <br /> Plan/Policy Document: TransPlan Policy, ADA Regulations <br /> Total Project Cost: $120,000 <br /> Street Lighting (Arterials & Install new or upgraded street lights along arterial and collector streets based on <br /> <br /> `Collectors) priority needs. <br /> Plan/Policy Document: TransPlan <br /> Total Project Cost: $360,000 <br /> Street Lighting (Residential} install new or upgraded street lights along local streets and in residential areas. <br /> Locations are based on a priority system that incorporates crime activity, lighting <br /> needs, location and availability of power. <br /> Plan/Policy Document: Street Lighting Priority List, TransPlan <br /> Total Project Cost: $120,000 <br /> City of Eugene 2004-2009 Capital Improvement Program <br /> 5 <br /> r <br /> <br />