New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Airport New Site Facilities
COE
>
PW
>
Admin
>
Execs
>
Executive non-confidential
>
Historical
>
Airport New Site Facilities
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/11/2010 9:56:32 AM
Creation date
8/6/2008 9:48:11 AM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Airport
PWA_Project_Area
Budget
PW_Subject
Airport Improvements 2005
Document_Date
9/26/2008
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> Airport <br /> Install Sanitary Disposal Site Install facility to discharge. airline passenger waste into sanitary sewer system <br /> south of Terminal Building. <br /> Plan/Policy Document: None <br /> Total Project Cost: $30,000 <br /> Install. street lights on Airport Add street lights to improve road illumination. <br /> Road & Northrup <br /> Plan/Policy Document: None <br /> Total Project Cost: $185,000 <br /> Master Plan Update Update the existing master plan. <br /> Plan/Policy Document: Airport Master Plan Update, FAA & State 5-Year Plan <br /> Total Project Cost: $250,000 <br /> Overlay of Runway 34/16 Repair and resurface the primary runway to prolong the useful life. <br /> Plan/Policy Document: Airport Master Plan Update <br /> Total Project Cost: $2,500,000 <br /> Rental Car Parking Expansion Expand the rental car parking area (73 spaces.) <br /> Plan/Policy Document: Airport Master Plan Update; FAA & State 5-Year Plan <br /> Total Project Cost: $93,000 <br /> Repave Douglas Drive Resurface Douglas Drive leading up to and past Terminal Building. <br /> Plan/Policy Document: FAA & State 5-Year Plan <br /> Total Project Cost: $200,000 <br /> Replace Airfield Signs Replace signage on Airfield. <br /> Plan/Policy Document: None <br /> Total Project Cost: $125,000 <br /> Runway 3/21 Closure Abandon portions of runway 3/21 and improve portions of runway 3/21 to be <br /> used as a taxiway. <br /> Plan/Policy Document: Airport Master Plan Update, FAA & State 5-Year Plan <br /> Total Project Cost: $431,000 <br /> City of Eugene 20042009 Capital Improvement Program <br /> 5 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.