New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Airport New Site Facilities
COE
>
PW
>
Admin
>
Execs
>
Executive non-confidential
>
Historical
>
Airport New Site Facilities
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/11/2010 9:56:32 AM
Creation date
8/6/2008 9:48:11 AM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Airport
PWA_Project_Area
Budget
PW_Subject
Airport Improvements 2005
Document_Date
9/26/2008
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> Airport <br /> Table of Funded Projects <br /> (Figures in $1000's) <br /> 2004 2005 2006 2007 2008 2009 Total <br /> Site and Facility Improvements <br /> Access Road Improvements 100 100 <br /> Access Road Improvements and Signage 2,579 2,579 <br /> Aircraft Wash Station 175 175 <br /> Airfield Equipment Storage .:275 275 <br /> Airport Entrance Road 200 200 <br /> Airport Improvement Projects 200 250 450 <br /> Auto Parking Expansion 397 397 <br /> Circulation Road Improvements 4,918 4,918 <br /> Construct Taxiway Kilo 1,379 1,379 <br /> Deicing Collection System 541 541 <br /> Expand Ai r Cargo Ramp 780 780 <br /> Fiber Optic Line to Airport 125 125 <br /> Flight Information Display System 50 50 <br /> Gate Upgrades -Gates 60 and 100/110 60 60 <br /> Install Sanitary Disposal Site 30 30 <br /> Install street lights on Airport Road & Northrup 185 185 <br /> Master Plan Update 250 250 <br /> Overlay of Runway 34/16 2,500 2,500 <br /> Rental Car Parking Expansion ~ 93 93 <br /> Repave Douglas Drive 200 200 <br /> Replace Airfield Signs 125 125 <br /> Runway 3/21 Closure 431 431 <br /> Service Roads 36 36 <br /> Stairway Enclosure- North Side 180 180 <br /> Taxilane -Development Area #2, Phase 2 304 304 <br /> Terminal Building Expansion 2,276 2,276 <br /> Upgrade Taxiway Charlie 961 961 <br /> Wetlands Delineation/Mitigation 75 75 <br /> Subtotal 2,580 1,379 6,320 4,193 427 4,776 19,675 <br /> New Capital Facilities <br /> Acquire Skidometer Machine 60 60 <br /> Acquire Snow Removal Equipment Vehicle 184 196 380 <br /> Construct Exit Taxiway Alpha-4 200 200 <br /> Construct Parallel Runway 10,212 10,211 20,423 <br /> General Aviation Terminal 375 375 <br /> Subtotal 10,272 10,595 375 196 21,438 <br /> tTotal 12,852 11,974 6,695 4,193 623 4,776 41,113 <br /> tThese totals are not fund-specific and include all programmed funds. For information about specific funds and detailed project funding for <br /> FY2004 and FY2005 , refer to the Two Year Fund Detail on the previous page(s). <br /> City of Eugene 20042009 Capital. Improvement Program <br /> 2 <br /> _ <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.