Harvey Road -Project # <br /> Creswell UGB to Hillegas Ave. Mile Post 1.146 to 1.377 <br /> Estimated Cost: $1,815,000 <br /> PRELIMINARY PROJECT SCOPE: Improve to urban standards.. <br /> ADT* (year) PCI** Avg. Reported Functional <br /> Width Crashes (5 yr) Class ' <br /> (ft.) <br /> Existing 2100 (2000) 73 26 1(fatal in 1998) Urban Major <br /> Conditions Collector ' <br /> *Average Daily Traffic <br /> **Pavement Condition Index (1-100) <br /> _ <br /> e <br /> f~ <br /> ,I <br /> , <br /> .x_ <br /> i , <br /> i ! ~ - <br /> , - , <br /> i ~ I i ' 7` <br /> Vicini Ma ~ ~ 1,rt ~ ` <br /> ty P Existing Road <br /> City of Creswell - <br /> Define the Problem: Relatively narrow Proposed Solution: Upgrade to County <br /> rural road in an area of Creswell where new urban standards with curb, gutter, sidewalk j <br /> development is anticipated. and bike lanes. Need and location of turn <br /> lanes to be determined. !i <br /> I~ <br /> Project Status: Proposed for FY 2008 in 07-11 CIP. <br /> Project Category: General Construction <br /> Submitted By: Lane County Public Works <br /> <br /> Roadway Jurisdiction: Lane County <br /> i <br /> 1 of 2 <br /> <br />