07-11 "Draft CIP <br /> CATEGORY FY 06-07 FY 07-08 FY 08-09 FY 09-10 FY 10-11 <br /> STRUCTURES <br /> Brice Creek, m 3.31 HBRR ' 1,791,457 <br /> London Road, m 8.73 OTIA III e 896,000 <br /> London Road, m 11.25 OTIA III e 782,000 <br /> London Road, m 13.01 OTIA III s 783,000 <br /> Shar s Creek Road, m 8.72 HBRR ' 1,536,941 <br /> TOTAL 2,461,000 0 3,328,398 0 0 <br /> CATEGORY FY 06-07 FY 07-08 FY 08-09 FY 09-10 FY 10-11 <br /> PRESERVATION/REHABILITATION FUNDS <br /> Overla s and Pavement Rehabilitation 9 3,000,000 3,000,000 3,000,000 3,000,000 3,000,000 <br /> Brid a Rehabilitation and Preservation <br /> Covered Brid a Rehabilitation 0 300,000 0 0 0 <br /> TOTAL 3,000,000 3,300,000 3,000,000 3,000,000 3,000,000 <br /> CATEGORY FY 06-07 FY 07-08 FY 08-09 FY 09-10 FY 10-11 <br /> SAFETY IMPROVEMENTS <br /> Safe Fund 10 300,000 <br /> Delta/Beltline Interchange Operations 1,100,000 <br /> Irvin Road at NW Ex resswa and UP Railroad'Crossin " 1,500,000 <br /> TOTAL 0 1,800,000 1,100,000 0 0 <br /> <br /> 01 /31 /2006 Page 4 <br /> <br />