•i <br /> Wilkes Drive -Project. #3214-1 <br /> .River Rd. to River Loop #1 MP 0.0 to 0.932 ~ ; <br /> Estimated Cost: $3,000,000 <br /> PRELIMINARY PROJECT SCOPE: Construct 2 to 3-lane urban facility. <br /> ADT* (year) PCI~~ Avg. Reported Functional Class <br /> Width ft. Crashes (5 r <br /> Existing 4,050 (2001) 85 32 1 Urban Major <br /> Conditions Collector <br /> *A~erage Daily Traffic <br /> **Pavement Condition Index (1-100) <br /> N41tES DR • J311A0. E; 00.4022 LeN.ap: •121173/N/.i161; iM~2299%.61A~7519A6 9R2W19MISI M~1:15~ <br /> ( 11 <br /> 1 <br /> j <br /> t <br /> i <br /> i <br /> ..-..i i~ <br /> r <br /> i <br /> WRREB DRS <br /> m <br /> i <br /> `i <br /> Hojoct lYnW ~ <br /> ~.i <br /> 1 <br /> ' ..J i <br /> Vicinity Map <br /> City of Eugene Existing Road <br /> I <br /> i. <br /> Define the Problem: Major collector road Proposed Solution: Upgrade to urban <br /> with adjacent residential neighborhoods standards with curb, gutter; sidewalk, and I <br /> and a middle school. Lacks adequate bike bike lanes, providing improved <br /> and pedestrian facilities on both sides of connectivity to area destinations for bikes <br /> the road. Road also has multiple road and and pedestrians. Improve road capacity <br /> driveway intersections but no turn lanes. through installation of turn lanes at selected <br /> ..intersections. <br /> Project Status: Originally adopted in 04-08 CIP. Unscheduled in 06-10 CIP. Added to I, <br /> <br /> Projects for Development list in 07-I1 CIP. Identified in TransPlan as project #554 and 'i <br /> the Lane County TSP as project #44. I <br /> i <br /> Project Category: Projects for Development -General Construction <br /> I <br /> Submitted By: Lane County Public Works <br /> Roadway Jurisdiction: Lane County , <br /> i <br /> 1 of 2 <br /> _ <br /> <br />