Marcola Road -Project #1900-1 <br /> Wendling Rd. to Johnson Rd. MP 11.49 to 16.08 <br /> Estimated Cost: $4,235,000 <br /> PRELIMINARY PROJECT SCOPE: Widen and overlay,.realign curves to achieve 55 <br /> MPH design speed. <br /> ADT* .(year) PCI** Avg. Reported Functional Class <br /> Width ft.) Crashes (5 r <br /> Existing 1,900 (2001) 70 23 14 Rural Major <br /> Conditions Collector <br /> *Average Daily Traffic <br /> **Pavement Condition Index (1-100) <br /> M?4C9LA RD-f?M~90 N~OAF 12A8 LWtpl :•122,9197H1.5&1;7JY 9?N91: 9?9".9fT9.558A5209V9 <br /> RapolkA. <br /> ~ j <br /> ~ ~ <br /> Vicinity Map $ ~ Existing Road <br /> t <br /> Define the Problem: High speeds and Proposed Solution: Add pavement <br /> heavy truck traffic necessitate structure with a 2-inch. overlay. Widen to <br /> modernization of the road to improve provide paved shoulders and meet County <br /> safety. Pavement structure needs:. standards and realign two curves that do <br /> improvement as well. The Cash Creek not maintain a 55 MPH design speed. The <br /> Bridge is included in the project due to bridge structure will likely be replaced with <br /> decayed timber pilings and caps that anew stricture consistent with applicable <br /> require replacement. standards for load capacity, geometry, and <br /> safety features. <br /> i <br /> Project Status: Originally adopted in 97-01 CIP. Scheduled in the 07-11 CIP in FY <br /> 2007. This is a "committed" project. Identified in Lane County TSP as project #88. <br /> Project Category: General Construction <br /> Submitted By: Lane County Public Works <br /> <br /> Roadway Jurisdiction: Lane County <br /> 1 of 2 <br /> <br />