Jasper Road Extension - Project #1.994-2 <br /> S. 57th to Jasper Rd. <br /> Estimated Cost: $4,372,500 <br /> PRELIMINARY PROJECT SCOPE: Construction of a new arterial. <br /> *Average Daily Traffic <br /> **Pavement Condition Index (1-100) <br /> ADT* (year) PCI~* .Avg. Reported Functional Class <br /> Width ft. Crashes (5 r <br /> Existing NA NA NA NA Urban Minor <br /> Conditions Arterial <br /> ~r ~ <br /> ~ <br /> Vicinity Map Image not available. <br /> SE Springfield ` <br /> i <br /> Define the Problem: Currently, through Proposed Solution: Construct new arterial <br /> traffic must go through the local street .between the Eugene-Springfield Highway <br /> network. A portion of the extension was and the Springfield-Creswell Highway. The <br /> completed in 2004. new road will be a limited access <br /> expressway between Main Street and <br /> Jasper Road, providing access to the <br /> Natron area for new development and <br /> removin traffic from S. 57th Street. <br /> Project Status: Originally adopted in 97=01 CIP. Scheduled in the 07-ll CIP in FY <br /> 2007. This is a "committed" project. TransPlan project #66. Lane County TSP project <br /> <br /> #55, <br /> Project Category: General Construction j <br /> Submitted By: Lane County Public Works. <br /> Roadway Jurisdiction: Lane County <br /> 1 of 2 <br /> <br />