ij~ <br /> Green Hill Road -Project #4270-1 <br /> Royal Ave. to Clear Lake Rd. MP 2.818 to 5.072 ~ ~ i <br /> Estimated Cost: $4,400,000 <br /> PRELIMINARY PROJECT SCOPE: Addition of paved shoulders, curb and gutter, or <br /> combination thereof. <br /> ADT* (year) PCI** Avg. Reported Functional Class <br /> Width ft. Crashes (5 r <br /> Existing 4,650 (2001) 89 26 12 Rural Minor <br /> Conditions Arterial <br /> *Average Daily Traffic <br /> **Pavement Condition Index (1-100) <br /> ~o <br /> - ~ ~ <br /> i~. <br /> ~ 'q <br /> 0 ~ <br /> j i <br /> x j <br /> m ~ . <br /> w <br /> m ~ <br /> ~ AVdIUI <br /> RDYALAYE <br /> C <br /> Vicinity Map ~ ~ <br /> City of Eugene $ Existing Road <br /> I ~ <br /> Define the Problem: The road is Proposed Solution: Improve to current 1 <br /> substandard for its relatively high volume County standards. This roadway is an the <br /> of traffic. It serves as a major route to Fern edge of the UGB and may be designed with I:. <br /> Ridge Reservoir, the. Eugene Airport, and a combination of urban and rural standards. <br /> the communi of Alvadore. <br /> Project Status: Originally adopted in 03-07 CIP. Scheduled in the 06-10 CIP in FY <br /> 2008. Placed on Projects for Development list in 07-11 CIP. This project is part of ' <br /> TransPlan projects #454 and #485 and Lane County TSP projects #10 and #54. <br /> Project Category: Projects for Development -General Construction <br /> Submitted By: Lane County Public Works <br /> Roadway Jurisdiction: Lane County I~I, <br /> i. <br /> 1 of 2 <br /> <br /> _ <br /> <br />