New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
CIP 2
COE
>
PW
>
Admin
>
Execs
>
Executive non-confidential
>
Historical
>
CIP 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/11/2010 9:57:04 AM
Creation date
8/6/2008 9:48:05 AM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Engineering
PWA_Project_Area
Road Repair
PW_Subject
CIP
Document_Date
9/26/2008
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Bolton Hill Road -Project #4062 2 <br /> <br /> .Territorial Hwy. to DogwoodLn. MP 0.0 to 0.653 <br /> Estimated Cost: $1,800,000 <br /> PRELIMINARY PROJECT SCOPE: Upgrade roadway to urban standards with curb, <br /> gutter, sidewalk, and bike lanes. <br /> ADT* (year) PCI** Avg. Reported Functional Class <br /> Width- ft. Crashes (5 r <br /> Existing 2,050 (2001) 74 26 1 Urban Major <br /> Conditions Collector <br /> *Average Daily Traffic <br /> **Pavement Condition Index (1-100) <br /> r <br /> i <br /> i~ <br /> t <br /> I <br /> i <br /> j 0001'1000111 <br /> 1 <br /> 1 <br /> 1 50.0 heMO i <br /> •'r~ <br /> Vicinity Map ' <br /> ....s Existin Road <br /> City of Veneta g <br /> Define the Problem: Bolton Hill Road is Proposed Solution: Upgrade to County <br /> <br /> built to rural standards with roadside standards with 2 travel lanes, curb, gutter, <br /> ditches. It is lacking facilities for bike and sidewalk, and bike lanes. The project limits <br /> pedestrian activity in an area with encompass the residential side streets, <br /> residential subdivisions and a sports providing improved connectivity to area ' . <br /> complex/ball fields abutting the south side destinations for bikes and pedestrians. ~I, <br /> of the road. The residential side streets in Isolated turn lanes may be considered, such <br /> the project limits already have curb and as at the intersection with Territorial <br /> sidewalks and additional development is Highway. <br /> possible on adjacent vacant land. <br /> Project Status: Originally scheduled in 05-09 CIP for FY 2010.Unscheduled in 06-10 <br /> CIP. Placed on Projects for Development list in 07-11 CIP. Identified as project:#BS in <br /> <br /> the Veneta TSP andproject# 15 in the Lane County TSP. <br /> <br /> Project Category: Projects for Development -General Construction <br /> <br /> Submitted By: Lane County Public Works <br /> 1 of 2 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.