Beaver Street/Hunsaker Lane -Project #3320-2 ij <br /> .Division Ave. to River Rd. MP 0.0 to 1.141 <br /> Estimated Cost: $3,300,000 <br /> PRELIMINARY PROJECT SCOPE: Upgrade to 2-lane urban facility. <br /> *Average Daily Traffic <br /> **Pavement Condition Index (1-100) <br /> ADT* (year) PCI** Avg. Reported Functional Class <br /> Width ft. Crashes (5 r <br /> Existing 6,800 (1999) 90 28 7 Urban Minor <br /> Conditions Collector <br /> L~ LN~BFAVER Sr•332060. E: UA9:032tm/~ong;•723.12/8N4.10^I: L'Y 4231663.9 <br /> 1.d ~ <br /> ~ l <br /> ~ <br /> ~ <br /> I~- _ ~ ~r~°- ' <br /> '°'~"'Y'-F f <br /> I I i <br /> eel'' I L. -...t~ ~~~r <br /> Vicinity Map <br /> Santa Clara Area ~ Ex15t1ng Road <br /> Define the Problem: The road Proposed Solution: Upgrade to urban <br /> experiences heavy traffic volumes during standards with 2 travel lanes, curb, gutter, I <br /> peak periods, providing access to sidewalk, and bike lanes. Consider turn ~~i <br /> residential neighborhoods and used by lanes at River Road and at Division <br /> many residents as a connection between Avenue. <br /> Division Avenue and River Road in the <br /> Santa Clara area. Existing road has no bike <br /> or edestrian facilities. <br /> Project Status: First adopted. in the 03-07 CIP. Dropped in 06-10 CIP due to <br /> reprioritization. Proposed in 07-11 CIP in FY 09-10. Identified as project #527 in <br /> TransPlan and project #48 in the Lane County TSP. I <br /> Project Category: General Construction <br /> <br /> .Submitted By: Lane County Public Works <br /> t <br /> Roadway Jurisdiction: Lane County <br /> i <br /> i <br /> I of 2 <br /> <br />