Engineering Division <br /> Team Central: <br /> • .New Real Property Officer pQSition in Team Central <br /> Darwin Team: ~ <br /> • Reclassified Engineering Technician (ET) position on Darwin Team <br /> to Associate Engineering Technician (AET) <br /> Darwin and East Teams: <br /> • Reclassified ETs to create AET leads for surveying, CADD and <br /> Construction Management <br /> Administrative Support Team.: <br /> • Reclassified two Program Specialist A positions in Administrative <br /> Support Team to Program Coordinator and Sr. Administrative <br /> Specialist <br /> Transportation Planning Team: <br /> • Changed TP Manager position description of Principal Engineer to <br /> Principal Engineer/Principal Planner <br /> • Expanded TP Engineering position description from Civil Engineer II <br /> to Civil Engineer II/Senior Planner <br /> Maintenance Division <br /> Subsurface Operations: <br /> • Moved Stormwater Maintenance team from Subsurface to Surface <br /> Maintenance section. <br /> • Moved Application System staff from Subsurface Technical to its <br /> own team within Subsurface Operations. <br /> • Transferred Engineering Associate from Engineering to Subsurface <br /> section for Infiltration/Inflow (I/I) WW program <br /> Finance and Administrative Team: <br /> • Moved Safety Coordinator from Traffic Section, added Emergency <br /> Management coordination to the position, now Safety and <br /> Emergency Management Coordinator <br /> Traffic Operations: <br /> • ,Moved Civil Engineer II from PWE to serve as Traffic Signal Engineer <br /> at PWM-TO <br /> • Divided the Traffic Technical Team, half moved to the Surface <br /> Technical team. ' <br /> <br /> AFSCME Classification Study -July 2004 <br /> • Change of Maintenance Technician Series, adding ASE certification <br /> Page 3 <br /> <br />