»Engineering Geologist and said that it would take about three weeks <br />»get a report back. He'll be putting together a report on the three <br />»alignments we've discussed, one along the toe of the slope, and the <br />.~~~other two alony the all:er•iidLe k~riaye loc.;dLiuiis we looked at - onr a <br />» further downstream from the original bridge location and one with <br />»beginning right at the south edge of the meadow. <br />»Here's the contact information: <br />»GeoScience <br />»geosci@mindspring.com <br />» (541) 607-5700 <br />»-Philip <br />»-----Original Message----- <br />»From: Integrations [mailto:integrations@integr8.com] <br />»Sent: Thursday, July 01, 2004 6:.51 PM <br />»To: RICHARDSON Philip S <br />»Subject: Re: Amazon Headwaters Trail - lower creek crossing <br />»Hey Philip, <br />» What's the status of getting the geo-tech out to look at bridge <br />»support questions? <br />» ~zane <br />to <br />1.,a.t <br />Zane J Cornett zane@integr8.com <br />Integrations 541/485-7708 voice <br />5209 Canyon Drive 541/344-0368 fax <br />Eugene, OR 97405 www.integr8.com <br />2 <br />