.evidence these impacts have not been adequately mitigated has not been provided. Staff finds <br />however that consideration of the. natural site constraints, including steep slopes and significant <br />vegetation has not been demonstrated.. ' <br />Consistent with EC 9.7330, unless the applicant agrees to a longer time `period, the Eugene Hearings <br />Official shall approve, approve with conditions, or deny this Type III application within 15 days <br />following close of the public record The decision shall be based upon and be accompanied by <br />f ndings that explain the criteria and standards considered relevant to the decision, stating the facts <br />relied upon in rendering a decision and explaining the justification for the decision based upon the <br />criteria, standards, and facts set forth. Notice of the written decision will be mailed in accordance with <br />EC 9.7335. Within 12 days of the date the decision is mailed, it may be appealed to the Eugene <br />Planning Commission as set forth at EC 9.7650 through EC 9.7685. <br />Attachments: <br />It was not feasible to reprint all of the written materials, :full-sized site plans, and other items included <br />in the public record for this application as part of the attachments to the staff report. Several relevant <br />items are attached to this report for ease of reference, however, the balance of the other materials listed <br />below are only available far review at the Planning Division.. Copies of these additional materials can <br />be provided upon request, for. a fee. The Hearings Official will be provided a full set of the applicant's <br />materials for review, and the full application fle will be made available at the public hearing. <br />.Attachment A: Applicant's Reduced Site Plan <br />Attachment B: Public Testimony <br />Attachment C: Vicinity Map <br />The following additional items are included in the public record for this application and have <br />been provided to the Hearings Official. These items are available for review at the Planning <br />Division: <br />Application Materials received March 2, 2007 <br />--Written Statement <br />' - At borxcultural Report Addendum ' <br />--Open Space Enhancement Plan <br />--Tree Preservation Compliance <br />=-Protection of Natural Features Compliance <br />--Wetland Delineation <br />- DSL Wetland Concurrence Letter <br />--Hydrology Study <br />--Transpor7ation Impact Analysis <br />--Rare Plant Survey <br />--Title Report <br />-- Draft Covenants, Conditions and Restrictions <br />--Letter from Tom Coyle <br />--Full size plan set titled Deerbrook PUD; A Planned Unit Development <br />--Full size plan set titled Tentative PIID Deer brook,• Water Resources Conservation Overlay Zone <br />--Full size plans (2 sheets) tr'tled Master Plan <br />For More Information: <br />Please contact Lydia McKinney, Associate Planner, Eugene Planning Division, by phone at (541) 682- <br />5485, or by e-mail, at Lydia.s.mclcinney@ci.eugene.or.us. <br />Deerbrook PUD (PDT 06-2/SDR 06-1) April 16, ?007 37 <br />