New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
1998
COE
>
PW
>
Admin
>
Public Affairs
>
Historical
>
1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2008 1:46:09 PM
Creation date
8/5/2008 12:01:47 PM
Metadata
Fields
Template:
PW_Public_Affairs
PW_Document_Type_Public_Affairs
News Release
External_View
No
PWA_Release_Date
1/1/1998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
112
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
I ~JI,IL~~r~ ~ - ~ <br /> ~I <br /> Jhme 17, 1998 <br /> u,ONTACT: Bob Terrel, Project Manager, 682-5560 <br /> From Public Information Section, 682-5523 <br /> >~'OR IMMEDIATE RELEASE <br /> REPAVING WORK TO START MONDAY ON 8TH AVENUE AND OAK STREET <br /> A four-week project to repair and repave 8th Avenue between Oak and Charnelton streets <br /> and Oak Street between 13`h and 5`h avenues is scheduled to begin Monday, June 22. <br /> III Eugene Sand and Gravel has been awarded the contract for the $434,000 project, financed <br /> bl' the Ci of Eu ene's road fund. In the first hase of construction, curbs and utters will be <br /> ty g P g <br /> replaced at various locations in the project area. Then workers will repair Oak Street from 13~' to <br /> 11~' avenues and 6`h to 5"' avenues. In the final phase, both Oak and 8`h will be repaved with a 2 <br /> inch layer of asphalt concrete. Generally, existing lane configurations will not be altered. <br /> Construction work on 8``' Avenue from Oak to Charnelton streets and on Oak Street <br /> between 13`h and 11"' avenues generally will occur during the daytime, between 7 a.m. and 10 <br /> p;m. One travel lane will be kept open throughout most of the project. <br /> '~I Construction on Oak Street between 11"' and 5`'' avenues generally will occur at night, <br /> b~tween 8 p.m. and 6 a.m. Two travel lanes will be kept open during non-working hours. <br /> No on-street parking will be allowed in the project area on either Oak or 8`h Avenue <br /> daring construction. The project is scheduled to be completed by July 17. <br /> For updates of this and other local road projects, call the City of Eugene construction <br /> hotline at 984-8484. <br /> <br /> Publio Works • Administration • City of Eugene • 858 Pearl • Eugene, OR 97401-2727 • Phone: (541) 682-5262 • FAX (541) 682-6826 . <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.