New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
1997
COE
>
PW
>
Admin
>
Public Affairs
>
Historical
>
1997
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2008 1:45:30 PM
Creation date
8/5/2008 11:32:39 AM
Metadata
Fields
Template:
PW_Public_Affairs
PW_Document_Type_Public_Affairs
News Release
External_View
No
PWA_Release_Date
1/1/1997
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
146
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ctober 24, 199 <br /> ONTACT: To Larsen, Project Manager 682-8450 <br /> F rry Street Brid e Project Public Information 682-8449 <br /> F R IMMEDI TE RELEASE <br /> TRAFFIC ADVISORY <br /> 1VIGHTTI E TRAFFIC ON FERRY STREET BRIDGE CUT TO TWO LANES <br /> Nighttime traffic on the south side of the Ferry Street Bridge will be limited to two lanes <br /> one lane in eac direction beginning Monday, October 27, and continuing through Friday, <br /> O tober 31, to all w removal of the sidewalk on the west side of the bridge viaduct. In addition, <br /> th Sixth Avenue xit ramp will be closed at night next week. <br /> Flaggers 'll divert southbound traffic across the median just south of Third Avenue into <br /> pne of two lanes n rurally used by northbound traffic and back into the southbound lanes south <br /> Of ixth Avenue. orthbound traffic will be limited to one lane between Seventh and Third <br /> av nues. Motorist traveling in the corridor between 7 p.m. and 6 a.m. should reduce speed, <br /> `iv ch the warning igns and be prepared to stop. Motorists are encouraged to use alternate <br /> rio tes to avoid co truction delays. <br /> i <br /> After the vi duct walkway is removed, the southbound lanes across the bridge viaduct <br /> wil reopen but wil be much narrower because concrete barricades will be in place. <br /> For constru tion updates, call the City's 24-hour traffic relief hotline at 984-8484 or the <br /> Fie Street Bridge project office at 682-8449, Monday through Friday, 8 a.m. to 5 p.m.. <br /> <br /> Puhlir, W~rkc • Ariministrat nn • (,itv of Fnnene. R5R Pearl . Fnnene ~R 974(11-9727 • Phone' (5411 682-5262 • FAX (5411 682-6826 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.