~ I/~ x/1/'/1/7/, /~i / <br /> October 4, 1996. <br /> Public Works <br /> CONTACT: Bob Terrel, Project Manager, 687-5560 Administration <br /> City of Eugene <br /> 858 Pearl Street <br /> From Public Information Section, 687-5523 Eugene, OR 97401 <br /> TRAFFIC ADVISORY: FOR IMMEDIATE RELEASE (503) 687-5262 <br /> <br /> II ti. <br /> PAVING WORK RESUMES ON COBURG ROAD, AMAZON PARKWAY <br /> <br /> I, Paving work on Coburg Road between Beltline Road and Kinney Loop will resume~Saturday, <br /> <br /> II October 5, and continue Monday and Tuesday, weather permitting. Work also is scheduled to resume on <br /> Amazon Parkway, which will be closed several days for paving. <br /> On Coburg Road, crews from Wildish Construction Co. will grind off the top layer of existing <br /> paving on Saturday using a process called rotomilling. Weather permitting, crews will begin repaving <br /> Coburg Road north of Beltline on Monday, October 7, and finish the paving Tuesday, October 8. While <br /> the rotomilling and paving work is being done, traffic on that portion of Coburg Road will be limited to <br /> one lane in each direction. <br /> On Amazon Parkway, crews will rotomill from 19th to 28th avenues on Monday and will <br /> rotomill 19th Avenue from Willamette to Pearl streets on Tuesday. Only one travel lane will be open <br /> during the rotomilling work on Amazon Parkway and 19th Avenue. Starting Wednesday, October 9, <br /> weather permitting, and continuing for several days, Amazon Parkway and 19th Avenue will be repaved. <br /> <br /> ~ Amazon Parkway will be closed to all traffic while it is being paved, and 19th Avenue will be reduced to <br /> <br /> I <br /> one lane for traffic. <br /> Also next week, motorists will encounter intermittent lane closures in the Ferry Street Bridge <br /> corridor as a crew conducts paving tests between Oakway Road on the north side of the bridge and <br /> Hilyard Street along East Broadway on the south side of the bridge. The testing work will be done <br /> between 9 a.m. and 3 p.m. to minimize traffic disruptions. <br /> ~ `For current information on City construction projects, call the traffic hotline at 984-8484. - <br /> <br />