New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
1995
COE
>
PW
>
Admin
>
Public Affairs
>
Historical
>
1995
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2008 1:44:46 PM
Creation date
8/5/2008 10:01:31 AM
Metadata
Fields
Template:
PW_Public_Affairs
PW_Document_Type_Public_Affairs
News Release
External_View
No
PWA_Release_Date
1/1/1995
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
202
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
I ~ fir/ <br /> Public Works <br /> MAY 26, 1 95 Administration <br /> City of Eugene <br /> CONTA Larry Lindley, Oregon Department of Transportation, 686-7610 858 Pearl Street <br /> From Publi Information Section, 687-5523 Eugene, OR 97401 <br /> (503) 687-5262 <br /> FOR IMM IATE RELEASE <br /> <br /> i <br /> PAVING ON HIGHWAY 99 REQUIRES TRAFFIC LANE DETOUR <br /> The first phase of the paving work on Highway 99 between Roosevelt Boulevard and <br /> Barger Dri a is scheduled to begin Wednesday evening, May 31, weather permitting. During <br /> paving, tra is will be diverted into temporary lanes, and some lanes will be closed. <br /> <br /> i <br /> On ednesday at 7 p.m., weather permitting, the northbound travel lanes will be closed <br /> <br /> I <br /> <br /> i <br /> for sealing d paving. Northbound traffic will be diverted to the shoulder lane on the east side <br /> <br /> I <br /> of the high ay. Southbound traffic will continue to use the two lanes on the west side of the <br /> highway. aving on the east side of the highway is expected to continue Thursday and Friday <br /> nights, and the newly paved northbound lanes are scheduled to be opened by early Saturday <br /> morning. fter the east side of the highway has been paved, the west side of the highway will be <br /> paved as ather permits. When the initial paving is completed on both sides of the highway, a <br /> final "wea ng course" of pavement will be applied to the full width of the roadway. <br /> <br /> ~ Sig swill be posted warning motorists of lane closures and detours. Motorists should use <br /> <br /> i <br /> <br /> I <br /> caution in a construction area, particularly when lane detours are in effect and flaggers and <br /> constructio workers are present. Motorists are encouraged to use Beltline Road or the Northwest <br /> Expresswa to avoid the work on Highway 99. <br /> <br /> I <br /> Th paving is the final phase of astate-funded project to widen and improve Highway 99 <br /> between R osevelt Boulevard and Barger Drive. Work on the project began last summer and is <br /> scheduled o be completed this summer. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.