New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
1993
COE
>
PW
>
Admin
>
Public Affairs
>
Historical
>
1993
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2008 1:43:55 PM
Creation date
8/5/2008 9:30:40 AM
Metadata
Fields
Template:
PW_Public_Affairs
PW_Document_Type_Public_Affairs
News Release
External_View
No
PWA_Release_Date
1/1/1993
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
201
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
~ ~ ~ ~l~~ 1 ~iT~/~ <br /> iii ~ ~i <br /> iii <br /> iii <br /> ~i~ ~--s~~i~~~?i~~~~ <br /> <br /> i <br /> <br /> ~ Public Works <br /> Administration <br /> City of Eugene <br /> 858 Pearl Street <br /> Eugene, OR 97401 <br /> (503) 687-5262 <br /> SEPTEMBER 30, 1993 <br /> CONTACT: Wayne Westfall, Project Manager, 687-5300 <br /> From Public Information Section, 687-5523 <br /> FOR IMMEDIATE RELEASE <br /> SEWER REPAIR WORK TO BEGIN <br /> Work to repair almost a mile of city sewer line is scheduled to begin October 4. <br /> Each year, the city repairs and rehabilitates portions of its 530-mile sanitary sewer <br /> system. As with other public improvements, the sewer system is aging and must be <br /> repaired and maintained to assure the city gets the full life from the system prior to <br /> replacement. With this project, plastic liners will be inserted into the sewer lines to seal <br /> cracks and prevent groundwater from entering the sewer system. Eliminating groundwater <br /> from the sanitary sewer system frees the system's capacity for its intended use of <br /> wastewater collection, and it also reduces the load on the regional sewage treatment plant. <br /> This..,year, the repair work involves approximately 5,000 lineal feet of sewer line in <br /> three areas: in the alley between Tyler and Polk streets from 24th to 26th avenues; in the <br /> alley betty ~ en 19th and 20th avenues from Pearl to Willamette streets; and in various <br /> locations between Lawrence and Polk streets from 20th to 26th avenues. Approximately <br /> 120 properties are served by the sewers scheduled to be repaired or rehabilitated. <br /> (more) <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.