New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
1993
COE
>
PW
>
Admin
>
Public Affairs
>
Historical
>
1993
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2008 1:43:55 PM
Creation date
8/5/2008 9:30:40 AM
Metadata
Fields
Template:
PW_Public_Affairs
PW_Document_Type_Public_Affairs
News Release
External_View
No
PWA_Release_Date
1/1/1993
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
201
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
~ / i J ~l~~ ~/i / /i T tai <br /> ~ /.r /L~~ <br /> Public Works <br /> Administration <br /> OCTOBER 18, 1993 City of Eugene <br /> 858 Pearl Street <br /> Eugene, OR 97401 <br /> CONTACT: Tom Larsen, Project Manager, 341-5886 (503) 687-5262 <br /> From Public Information Section, b87-5523 <br /> FOR IMMEDIATE RELEASE <br /> WE5T 11TH WORK SHIFTS BACK TO DAYTIlVIE SCHEDULE <br /> Work on the West 11th widening project will shift back to a daytime schedule, <br /> beginning Tuesday, October 19. The work will affect traffic on West 11th Avenue from <br /> Garfield to Tyinn. <br /> Major work items will include pavement repairs to damaged sections of the roadway, <br /> curb and sidewalk work, and continuing activities on the traffic signals. Repairs and curb <br /> work will require lane closures at various locations throughout the project area. <br /> Weather permitting, the surface should be ready to begin final paving during the week <br /> of October 25, with resurfacing currently scheduled to be completed by October 29. <br /> Traffic signal work will continue into November. <br /> <br /> Ii <br /> ~,I <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.