fir/ <br /> Public Works <br /> Administration <br /> City of Eugene <br /> 858 Pearl Street <br /> NOVEMBER 16, 1993 Eugene, OR 97401 <br /> (503) 687-5262 <br /> CONTACT: Doug Weber, Project Manager, 341-5866 <br /> From Public Information Section, 687-5523 <br /> FOR IMMEDIATE RELEASE <br /> I <br /> WILLAMETTE STREET PAVEMENT TO BE TESTED <br /> i <br /> i <br /> Cold-weather testing of the concrete paving on Willamette Street between 20th Avenue <br /> and 24th Place is scheduled on Thursday, November 18, and Friday, November 19. <br /> A crew from Pavement Service Inc. , under contract to the City of Eugene, will apply <br /> I~ loads to the road surface and measure the amount of shifting in the concrete slabs that form the <br /> base of Willamette Street south of 20th Avenue. One lane of traffic in each direction will be <br /> kept open during testing, which will be done between 9 a.m, and 4 p.m. <br /> l The results of this week's testing will be combined with information gathered last August <br /> to determine the extent of repairs needed on Willamette Street. The city plans to repair and <br /> <br /> I <br /> <br /> ~ repave Willamette Street between 20th and 24th avenues next year. <br /> <br />