New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
1994
COE
>
PW
>
Admin
>
Public Affairs
>
Historical
>
1994
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2008 1:44:35 PM
Creation date
8/4/2008 3:39:21 PM
Metadata
Fields
Template:
PW_Public_Affairs
PW_Document_Type_Public_Affairs
News Release
External_View
No
PWA_Release_Date
1/1/1994
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
263
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
I/ I~'~~ <br /> Public Works <br /> Administration <br /> City of Eugene <br /> OCTOBER 13, 1994 Eug nee,rOR 97401 <br /> (503) 687-5262 <br /> CONTACT Bob Staley, Project Manager, 687-5517 <br /> From Publi Information Section, 687-5523. <br /> FOR IMM DIATE RELEASE <br /> GLEN OOD TRUNK SEWER TO BE INSTALLED IN FRANKLIN BOULEVARD <br /> A s itary sewer trunk line will be installed in west Glenwood beginning Monday, <br /> October 17 The installation will cause some traffic delays and lane closures on Franklin <br /> Boulevard est and east of Glenwood Avenue. <br /> Wil ish Construction Company, under contract to the City of Eugene, will install a 24- <br /> inch diame er sewer line that will connect to the new Glenwood pump station. The pump <br /> i <br /> ' station will be connected to the force mains constructed across the Willamette River during <br /> the first ph e of the Glenwood sewer project. The new trunk system will collect sewage <br /> from the L urel Hill area in east Eugene and carry it to the east bank interceptor on the other <br /> side of the river, bypassing the deteriorated Judkins Point pump station. <br /> Th sewer line to be installed this fall will begin approximately 450 feet east of the <br /> intersectio of Franklin Boulevard and Glenwood Avenue and go west on Franklin <br /> approxima ely 1,000 feet before turning south into the area behind the Lane County Central <br /> Receiving tation. Traffic lanes will be closed while. the contractor is installing the sewer <br /> line and m king connections in Franklin Boulevard. Signs will be posted advising motorists <br /> i <br /> t <br /> of lane clo ures and traffic delays. <br /> <br /> '~w <br /> (mo~~e) <br /> I <br /> it <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.