IL~~ //I t`~~/ <br /> / / //~i 1• tI / /~i 1 <br /> Public Works <br /> Administration <br /> City of Eugene <br /> 858 Pearl Street <br /> Eugene, OR 97401 <br /> JUNE 15, 1 94 (503) 687-5262 <br /> CONTACT Diane Bishop, Bicycle Coordinator, 687-5298 <br /> From Publi Information Section, 687-5523 <br /> FOR IATE RELEASE <br /> B PATH CLOSED FOR SOUTH EUGENE HIGH SCHOOL REPAIRS <br /> Beg'nning Friday, June 17, the Amazon Bicycle Path from 19th Avenue to 24th <br /> Avenue wil be closed to through bicycle and pedestrian traffic. The section of bike path will <br /> remain clos d this summer while repair work is done on the South Eugene High School <br /> gymnasium roof. <br /> The repair work will require complete closure of the high school parking lot, located <br /> at 19th and Amazon Parkway, so that large cranes can safely remove and replace the roof. It <br /> is recomm nded that bicyclists use the bicycle lanes on Amazon Parkway between 19th and <br /> i <br /> 24th avenu s as a detour. Pedestrians can use the sidewalks on Patterson Street. <br /> i <br /> i <br /> ~ Th repairs on the South Eugene High School gymnasium roof are being completed by <br /> i <br /> ~ Hyland Co struction for the 4-J School District. <br /> ~ <br /> i <br /> i <br /> <br /> ~rrr <br /> <br />