New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
1990
COE
>
PW
>
Admin
>
Public Affairs
>
Historical
>
1990
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2008 1:42:18 PM
Creation date
8/4/2008 1:55:12 PM
Metadata
Fields
Template:
PW_Public_Affairs
PW_Document_Type_Public_Affairs
News Release
External_View
No
PWA_Release_Date
1/1/1990
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
y Public Works <br /> Engineering <br /> City of Eugene <br /> 858 Pearl Street <br /> N E W S R E .L E A S E Eugene, Oregon 97401 <br /> (503) 687-5291 <br /> July 6, 19 0 <br /> CONTACT: at Bayes, Project Manager, City of Eugene Engineering, 687-5228 <br /> <br /> ' va Smekens, The Eugene Clinic, 687-6217 <br /> From Sandr Gleason, Public Information, Public Works 687-5523 <br /> FOR IMMEDI TE RELEASE <br /> RECO STRUCTION OF A TWO-BLOCK SECTION OF OLIVE STREET TO BEGIN <br /> Eugen Sand and Gravel, under contract to the city of Eugene Public <br /> Works Depa tment, will begin reconstructing a two-block section of Olive <br /> Street, be ween Eleventh and Thirteenth avenues, on Thursday, July 12. The <br /> reconstruc ion is scheduled to coincide with The Eugene Clinic's improvement <br /> to their p rking lot. The work on Olive is scheduled for completion by <br /> _ <br /> August 2. <br /> Eugen Sand will excavate and repave Olive Street, install curb and <br /> gutter and new driveway approaches, and upgrade storm sewer ]fines. Utility <br /> companies lan to make minor repairs to their lines and pipes during <br /> constructi n. To minimize disruption, final paving will occur on a weekend. <br /> In co junction with the city's work on Olive, The Eugene Clinic will be <br /> improving nd resurfacing its parking lot, resulting in 50 additional parking <br /> spaces in ront of the Clinic on the south side of the building. The <br /> redesign w'll also improve access for patients. <br /> Durin the reconstruction, Olive Street will be closed to all traffic. <br /> The exit d iveway from the Olive Plaza retirement center will be kept open <br /> for cente residents and emergency vehicles. On-street parking will be <br /> temporaril removed, and the left turn lane on the north side of Thirteenth <br /> Avenue will be closed. <br /> ~ more <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.