New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
1991
COE
>
PW
>
Admin
>
Public Affairs
>
Historical
>
1991
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2008 1:43:00 PM
Creation date
8/4/2008 1:51:20 PM
Metadata
Fields
Template:
PW_Public_Affairs
PW_Document_Type_Public_Affairs
News Release
External_View
No
PWA_Release_Date
1/1/1991
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Public Works <br /> <br /> j~ City of Eugene <br /> ~r 858 Pearl Street <br /> N E W S R E L E A S E Eugene, Oregon 97401 <br /> (503) 687-5262 <br /> Ewgust 14, 991 <br /> (:ONTACT: P t Bayes, Project Manager, 687-5228 <br /> From Sandra Gleason, Public Information, 687-5523 <br /> FOR IMMEDIA E RELEASE <br /> RECONSTRUCTION OF 13TH AVENUE TO BEGIN <br /> Wildis Paving Company, under contract to the city of Eugene Public <br /> I <br /> 4lorks Depar ment, will begin reconstructing 13th Avenue from Washington to <br /> ~lillamette . treet on August 21. Completion is scheduled for late October. <br /> Phis is the third section of 13th to be improved in the last four years. <br /> I The co tractor will begin preparation work and will set out signs on <br /> E?ugust 19; tility companies have been working in the area to mark their <br /> lines for r location since August 12. <br /> The pr ject will be completed in two phases. In Phase I, the contractor <br /> will begin ork on the north side of 13th at Washington and will move east. <br /> 1'he north 1 ne will be completely closed the length of the project. One lane <br /> c?f traffic n the south will be kept open. The north side of the <br /> intersectio s at Lawrence, Lincoln, and Olive streets will be closed, but <br /> north bound traffic will be able to turn right onto 13th Avenue into the <br /> <.;outh lane. One lane will be kept open at the intersection of Charnelton and <br /> l.3th for so th bound motorists, and two lanes will be open at Willamette and <br /> ).3th inters ctions for both north and south bound traffic. <br /> During Phase II, which will begin in mid-September, the contractor will <br /> ` ~ switch to t e south side of the street. The south lane will be completely <br /> more <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.