New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
1991
COE
>
PW
>
Admin
>
Public Affairs
>
Historical
>
1991
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2008 1:43:00 PM
Creation date
8/4/2008 1:51:20 PM
Metadata
Fields
Template:
PW_Public_Affairs
PW_Document_Type_Public_Affairs
News Release
External_View
No
PWA_Release_Date
1/1/1991
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
I <br /> Public Works <br /> <br /> Vii. City of Eugene <br /> ~rr+ 858 Pearl Street <br /> N E W S R E L E A S E Eugene, Oregon 97401 <br /> (503) 687-5262 <br /> August 23, 1991 <br /> (:ONTACT: B d DeSantis, Project Manager, 687-5230 <br /> From Sandra Gleason, Public Information, 687-5523 <br /> FOR IMMEDIA E RELEASE <br /> I~ TRAFFIC SIGNAL AT BARGER AND BELTLINE TO BE OFF FOR ONE DAY <br /> To acc mmodate the widening of Barger Drive, the city of Eugene Public <br /> ;~lorks Depar ment must move and relocate the traffic signal at Barger Drive <br /> and Beltlin Road on Tuesday, August 27. The signal will be shut off for one <br /> ,clay, from 6 a.m. to 5 p.m. Two police officers will be at the intersection <br /> t:o direct t. affic. <br /> A Publ c Works spokesperson asked drivers to use caution when <br /> <<pproaching the intersection. <br /> The wo k is part of the Barger Drive widening project. Eugene Sand and <br /> (ravel, and r contract to the city, began widening Barger, between Primrose <br /> ~tnd Echo Ho low, on June 17. The scope of the project includes widening <br /> E;arger to a commodate two traffic lanes in each direction and constructing <br /> curb, Butte a planting strip, and a center turn lane for east and west <br /> t?ou.nd traff c at the Beltline and Barger Drive intersection. The project will <br /> t?e complete in December. <br /> ~ <br /> i <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.