New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
1991
COE
>
PW
>
Admin
>
Public Affairs
>
Historical
>
1991
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2008 1:43:00 PM
Creation date
8/4/2008 1:51:20 PM
Metadata
Fields
Template:
PW_Public_Affairs
PW_Document_Type_Public_Affairs
News Release
External_View
No
PWA_Release_Date
1/1/1991
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> r <br /> Public Works <br /> City of Eugene <br /> N E W S R E L E A S E 858 Pearl Street <br /> Eugene, Oregon 97401 <br /> (503) 687-5262 <br /> October 28, 1991 <br /> (:ONTACT: ale Mills, Project Manager, 683-6854 <br /> From Sandr Gleason, Public Information, 687-5523 <br /> FOR IMMEDI E RELEASE <br /> MEETING SCHEDULED ON HIGHWAY 99 IMPROVEMENT PROJECT <br /> ~ On We nesday, October 30, Engineering staff members from the city of <br /> Eugene Public Works Department will be available to talk to interested <br /> I <br /> community esidents about the scheduled improvements to Highway 99 between <br /> Foosevelt oulevard and Beltline Road. An informal drop-in session will run <br /> i'rom 4:00 0 8:30 p.m., with a formal presentation scheduled for 7:00 p.m. <br /> 1-he meetin will be held at Willamette High School, 1800 Echo Hollow Road, in <br /> i:he cafete i a. <br /> The city of Eugene, State of Oregon, and Lane County are planning to <br /> r•econstruc Highway 99 in two phases. Unit I from Barger Drive to Beltline <br /> is schedule for construction between April and October 1992 and includes <br /> viidening an repaving the roadway, improving traffic signals, and realigning <br /> i:he interse tion of Barger Drive and Highway 99. The Oregon Department of <br /> 1-ransportation (ODOT) will oversee this phase of the project. ODOT and Lane <br /> (:ounty will fund the full cost of the improvements. <br /> The se and phase, or Unit II, will run from Roosevelt Boulevard to <br /> Etarger Aven a and is scheduled for construction in the spring and summer of <br /> ].993. The roject will include rehabilitating the roadway, adding bicycle <br /> lanes and s'dewalks on both sides of the highway, improving traffic signals, <br /> installing torm drainage facilities (including curb and gutter), and <br /> more <br /> l <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.