News Rel ase Airport Temporary Lot <br /> July 1, 987 <br /> Page 2 <br /> so atten ed vehicle parking in front of the terminal will also be limited. <br /> The thre -minute unloading spaces are far dropping off luggage, and cars <br /> should b moved to the short-term or temporary long-term lots, explained <br /> Staley. <br /> The temporary lot will have 515 spaces. For security, the lot will have <br /> <br /> 'I an attend nt on duty 24-hours a day and will be well lighted and surrounded <br /> by a secu ity fence. <br /> Parking rates will remain the same. Long-term parking is $1.25 for the <br /> first hou plus an additional $.50 for each added hour, or portion of the <br /> hour. Th maximum daily rate is $4, and the maximum weekly rate is $20. <br /> Shor -term rates are $.75 for first half hour, and $.75 for the second <br /> half hour Each additional half hour, or portion of the hour, is $ .60. The <br /> short-ter lot has a maximum time limit of 24-hours for $6. <br /> Curre tly, the airport has approximately 1,000 public parking spaces. <br /> Once cons ruction is completed, 1,579 spaces will be available. <br /> Shutt a vans are provided by APCOA Parking Co. and by the City of Eugene. <br /> <br /> li Land ide construction includes parking lot reconstruction, major <br /> excavatio work, sewer line and irrigation line installation, construction <br /> of a car ental building, a car wash facility, a new parking toll station, <br /> and a cov red walkway from the parking area to the terminal. All landside <br /> construct on will be completed by October 15, 1987, except for the final <br /> landscapi g, which will be finished during the fall planting season. <br /> Expansion of the airport terminal will begin in March or April of 1988, and <br /> the entir, project will be completed in the fall of 1989. The cost for the <br /> project is $18.3 million. <br /> END <br /> <br /> I i <br /> <br />