New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Airport 1989-1993
COE
>
PW
>
Admin
>
Public Affairs
>
Historical
>
Airport 1989-1993
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2008 3:33:52 PM
Creation date
8/4/2008 10:40:31 AM
Metadata
Fields
Template:
PW_Public_Affairs
PW_Document_Type_Public_Affairs
News Release
PW_Division
Airport
PW_Subject_Public_Affairs
Airport
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
132
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
P <br /> <br /> r <br /> ' NEWS RELEASE <br /> July 2, 1 87 <br /> CONTACT: Bob Staley, Project Manager, 687-5123 <br /> Kay Kronholm, Project Information, 687-5297 <br /> FOR IMMED ATE RELEASE <br /> E GENE AIRPORT TO OPEN TEMPORARY LONG-TERM PARKING LOT <br /> Euge e, Ore.-- On Wednesday, July 8, the long-term parking lot at the <br /> Mahlon Sw et Airport in Eugene, Ore., will be closed and a temporary long-term <br /> lot acros from the current long-term parking area, will be opened. Passengers <br /> who will ly out of Eugene are encouraged to allow at least an extra half hour <br /> above wha is required for check in at the airline desks. <br /> The emporary relocation of the long-term lot is part of a two-year, <br /> $18.3 mil ion construction project at the airport that will increase current <br /> I <br /> terminal pace from 24,000 square feet to 90,000 square feet. The project <br /> includes xpanding the lobby and security areas, constructing a larger, <br /> mechanize baggage claim area, increasing the commercial space, and building <br /> a second evel concourse with an observation deck. During the project, the <br /> parking 1 is will be reconstructed and landscaped, and a covered walkway will <br /> II! be instal ed from the parking areas to the terminal. <br /> Park ng lot reconstruction and landscaping is scheduled for completion <br /> I'I by Octobe 15, 1987, and the permanent long-term parking lot will be reopened. <br /> Expansion of the airport terminal will begin in March, 1988, and the entire <br /> project will be completed in the fall of 1989. <br /> more <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.