New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
1986
COE
>
PW
>
Admin
>
Public Affairs
>
Historical
>
1986
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2008 2:43:19 PM
Creation date
8/4/2008 10:27:09 AM
Metadata
Fields
Template:
PW_Public_Affairs
PW_Document_Type_Public_Affairs
News Release
External_View
No
PWA_Release_Date
1/1/1986
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
1 <br /> ~ . <br /> 1 I _ ~ - - <br /> NELLO! <br /> ' Your street will be closed to ALL traffic including Bicycles <br /> ' between and <br /> i~ <br /> on far Slurry Seating. <br /> Slurry Seal is the most EFFICIENT and ECONOMICAL way <br /> 1 to repair and maintain your streets. <br /> I <br /> The Slurry is "Wet" when it is laid and will take about four <br /> hours drying time before it can be walked on without stick- <br /> ing to your feet. If you have any doubts whether it is dry <br /> enough, be sure to "test" it first. <br /> No vehicles (car, truck, trailer, boat, etc.) should be left <br /> ' parked on the street during this time. If you plan to drive <br /> your car during this time, please be sure that it is parked <br /> outside the work area or ask one of the workmen fpr as- <br /> sistance. You may drive on it as soon as the street closed <br /> . signs and barricades are removed. <br /> Your~iblic ~iciais ask your cooperation in assisting us to <br /> . - place a neW looking surtace on your street that will last for <br /> <br /> . ~ many years. <br /> Thank you, <br /> CfTY OF EUQENE <br /> ' I PUBLIC WORKS DEPARTMENT <br /> ~ i PHONE 687-5230 <br /> I <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.