,.y <br /> NEWS RELEASE <br /> July 24, 1 86 <br /> CONTACT: Ivan Koehn, 687-5230 <br /> andra Gleason, 687-5523 <br /> FOR IMMEDI TE RELEASE <br /> CITY RESURFACES STREETS <br /> J-PA INC., construction contractors from Spokane, Wash., will be <br /> ~I placing a slurry seal over 16 streets in the Eugene area beginning Wednesday, <br /> I <br /> July 24 a d continuing through Tuesday, July 29, 1986, as part of the city's <br /> yearly st eet maintenance program. Slurry sealing lays a coat of ashpalt- <br /> based mat rial over the street to repair the surface and to seal cracks. It <br /> is the mo t efficient and economical method for repairing and maintaining <br /> streets. <br /> The lurry takes four to six hours to dry, and will stick to wheels and <br /> ~ feet whil wet. Vehicles should be move from the street, and cars parked <br /> outside t e work area. The road may be driven on as soon as signs and <br /> barricade are removed. <br /> Foll wing is a schedule of streets scheduled for resurfacing: <br /> ~ July 25: 23rd Avenue between Jefferson Street and Monroe Street <br /> ~ Madison Street between 2350 Madison and 28th Avenue <br /> 28th Place between 28th Avenue and 1525 28th Avenue <br /> July 28: 39th Avenue between Kincaid Street and E. Amazon <br /> Kincaid Street between 35th Avenue and 39th Avenue <br /> <br /> i j Potter Place between 4085 Potter and 41st Avenue <br /> . 41st Avenue between E. Amazon and 1180 41st Avenue <br /> July 29: Cul-se-sac west of Bertelsen Road between house #'s 362-380 <br /> 26th Avenue between Charnelton Street and Lincoln Street <br /> 20th Avenue between Lincoln Street and Lawrence Street <br /> 22nd Avenue between Chambers Street and Grant Street <br /> END <br /> <br />