New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
1987
COE
>
PW
>
Admin
>
Public Affairs
>
Historical
>
1987
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2008 1:41:29 PM
Creation date
8/4/2008 10:14:01 AM
Metadata
Fields
Template:
PW_Public_Affairs
PW_Document_Type_Public_Affairs
News Release
External_View
No
PWA_Release_Date
1/1/1987
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
e. <br /> NEWS RELEASE <br /> r June 12, 1 87 <br /> CONTACT: van Koehn, Construction Supervisor, 687-5230 <br /> <br /> ' andra Gleason, Public Information, 687-5523 <br /> FOR IMMEDI TE RELEASE <br /> PUBLIC WORKS CREWS TO REPAIR CITY STREETS <br /> Aspha t Maintenance Associates, as Veneta contractor, will place a <br /> slurry sea over 21 streets in the Eugene area beginning Tuesday, June 16th <br /> ~ and contin ing through Thursday, June 18th. <br /> Slurr sealing places a 1/8-inch layer of asphalt-based material over <br /> the street to repair the surface and seal cracks. According to Ivan Koehn, <br /> construction supervisor, slurry sealing is the most economical method for <br /> ~ repairing and maintaining streets and is part of the city's routine <br /> maintenan a program. <br /> The lurry seal requires four to six hours to dry, depending on the <br /> weather, nd will stick to wheels and feet while wet. Vehicles should be <br /> moved fro the street and parked outside the work area. The road may be <br /> driven on as soon as signs and barricades are removed. <br /> ! Stre is scheduled for resurfacing include: <br /> i <br /> Tues ay, June 16: Chuckanut between Crescent and Lily <br /> Wingate between Crescent and Crescent <br /> Wingate cul de sac <br /> Cheryl Street between Crescent and Bon Vue <br /> Lily Avenue Cheryl and east <br /> Wedne day, June 17: Chuckanut four cul de sacs <br /> Chuckanut Crescent and north <br /> Cheryl Street three cul de sacs <br /> Terresa Avenue from Gilham to Montreal <br /> Balfour Terresa and north <br /> Norwood Street from Elysium to Rocky <br /> Norwood Street from Elysium to Palmer <br /> Palmer Avenue from Norwood to Lillian <br /> Lillian Street from Palmer to Elysium <br /> ',I <br /> r <br /> E more <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.