New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
1989
COE
>
PW
>
Admin
>
Public Affairs
>
Historical
>
1989
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2008 1:42:03 PM
Creation date
8/4/2008 9:58:26 AM
Metadata
Fields
Template:
PW_Public_Affairs
PW_Document_Type_Public_Affairs
News Release
External_View
No
PWA_Release_Date
1/1/1989
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
105
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> e <br /> PUBLIC WO S DEPARTMENT • 858 PEARL • EUGENE, OREGON 97401 <br /> NEWS RELEASE <br /> July 20, 1 89 <br /> CONTACT: at Bayes, Engineering,_687-5228 <br /> ob Terrel, Project Manager, 687-5382 <br /> From Sandr Gleason, Public Information, 687-5523 <br /> FOR IMMEDI TE RELEASE <br /> SATU DAY CLOSURE OF THIRTEENTH AVENUE COMPLETES TWO YEAR PROJECT <br /> On Sat rday, July 22, from 6 a.m. to 6 p.m., Wildish Corvallis <br /> Constructs n Co. will close Thirteenth Avenue between Patterson and Alder to <br /> lay the fi al lift of paving on Thirteenth. This will complete the two-year <br /> i <br /> project, and except for cleanup, the street will be open in time for the <br /> World Veteran Games. <br /> Durin the closure this Saturday, Thirteenth Avenue traffic will be <br /> detoured onto Ferry then onto Fourteenth Avenue; Patterson traffic will be <br /> detoured o Twelfth Avenue to Ferry to Fourteenth; and Hilyard traffic will <br /> be detour d onto Fourteenth to Kincaid, then to Eleventh Avenue. <br /> Buss ess along the closed section will remain open, with parking <br /> available on adjacent streets or in the parking lots accessible from the <br /> alley to he south of Thirteenth. <br /> Work on the $715,000 project included widening Thirteenth two feet; <br /> installin turn pockets on major cross streets; replacing sidewalks, curbs, <br /> gutters, nd signals at all major intersections; building storm sewer lines <br /> along the entire length of the project; and installing an eight-inch sanitary <br /> sewer lin between Pearl and High Streets to replace a failed section of old <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.