PUBLIC WO S DEPARTMENT • 858 PEARL • EUGENE, OREGON 97401 <br /> NEWS RELEASE <br /> December 1989 <br /> CONTACT: Doug Weber, Supervising Engineer, 341-5866 <br /> Pat Bayes, Project Manager, 687-5228 <br /> Sandra Gleason, Public Information, 687-5523 <br /> FOR IMMED ATE RELEASE <br /> REPAIR WORK ON BELTLINE TO CREATE TEMPORARY LANE CLOSURES <br /> The nstallation of a 72-inch storm sewer pipe under Beltline Road will <br /> create so a temporary lane closures on Beltline between the Coburg and I-5 <br /> exits beg nning at 7 a.m. on Monday, Dec. 4. Construction is expected to <br /> continue hrough the week. <br /> Crew from Wildish Corvallis Construction Co. will begin on the north <br /> side of B ltline and will move south, closing one lane at a time, beginning <br /> with the utside, westbound lane. Motorists can expect some delays and are <br /> asked to void the area during the construction. <br /> Wild sh was hired by the city of Eugene to install the two pipes to help <br /> drain sto m water from the area. This is the second pipe to be installed; <br /> the first pipe was laid last week. <br /> The ew pipes will drain the storm water from the areas south of <br /> Beltline etween Beltline Road and Harlow Road and between Coburg Road and <br /> I-5. <br /> <br /> i <br /> <br />