New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
1989
COE
>
PW
>
Admin
>
Public Affairs
>
Historical
>
1989
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2008 1:42:03 PM
Creation date
8/4/2008 9:58:26 AM
Metadata
Fields
Template:
PW_Public_Affairs
PW_Document_Type_Public_Affairs
News Release
External_View
No
PWA_Release_Date
1/1/1989
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
105
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> yl <br /> ' PUBLIC WO S DEPARTMENT • 858 PEARL, SUITE 300 • EUGENE, OREGON 97401 • (503) 687-5218 <br /> ~ TRANSPORT ION DIVISION <br /> NEWS RELEASE <br /> August 10, 1989 ,w <br /> CONTACT: oug Weber, Engineering, 687-5866 <br /> rant Williams, Transportation, 687-5218 <br /> ave Reinhard, Transportation, 687-5218 <br /> From Sandr Gleason, Public Information, 687-5523 <br /> FOR IMMEDI TE RELEASE <br /> ENGINEERING DESIGN CONSULTANTS SELECTED FOR <br /> RIVERFRONT RESEARCH PARK PROJECT <br /> Eugen Oregon The city of Eugene Public Works Department has <br /> selected hree consultants for the design of bridge and drainage structures, <br /> ~ geotechni al and pavement structures, and geometric and traffic engineering <br /> design fo the Riverfront Research Park. OBEC Consulting Engineers of <br /> Eugene, 0 egon was hired to design the bridge and drainage structures; <br /> Kelly/Str zer Associates, in association with Pavement Services, Inc., both <br /> of Portla d, Oregon will prepare the geotechnical and pavement structure <br /> designs; nd JRH Transportation Engineering of Eugene was hired to develop <br /> the geome ric and traffic design. <br /> As p rt of the study, OBEC Consulting Engineers will explore the <br /> feasibili y of several possible crossing structures and will make foundation <br /> studies, repare all needed geotechnical reports, investigate alternative <br /> structure types and related cost estimates, and prepare required permits. <br /> Their rep rt will be used to hire a contractor to construct the needed <br /> bridges d drainage structures. The preliminary estimate for OBEC's analysis <br /> is $89,9 1. <br /> ~ Kelly/Strazer Associates will develop subsurface information on soil and <br /> (more) <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.