New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
1989
COE
>
PW
>
Admin
>
Public Affairs
>
Historical
>
1989
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2008 1:42:03 PM
Creation date
8/4/2008 9:58:26 AM
Metadata
Fields
Template:
PW_Public_Affairs
PW_Document_Type_Public_Affairs
News Release
External_View
No
PWA_Release_Date
1/1/1989
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
105
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
~ i <br /> <br /> r ~ .++r <br /> PUBLIC WO S DEPARTMENT • 858 PEARL • EUGENE, OREGON 97401 <br /> NEWS RELEASE , <br /> August 29, 1989 <br /> i <br /> CONTACT: at Bayes, Project Manager, 687-5228 <br /> j oug Weber, Engineering, 341-5866 <br /> From Sandr Gleason, Public Information, 687-5523 <br /> FOR IMMEDI TE RELEASE <br /> EARL AND HIGH STREETS TO BE CLOSED TO PAVE EIGHTH AVENUE <br /> AND WORK TO BEGIN ON EAST BROADWAY <br /> On Sa urday, September 2, from 5:45 a.m. to 6 p.m., Wildish Corvallis <br /> ~ Constructi n Co., will pave Eighth Avenue. During Saturday's paving, both <br /> Pearl and High Streets between Seventh Avenue and Broadway will be completely <br /> ~ closed to through traffic, and motorists will be detoured around the area. <br /> Eighth Av nue will be reopened beginning at 6 p.m. Saturday evening, <br /> completin the first phase of the project. Work will continue on the <br /> I~ sidewalks and parking lot entrances over the next several weeks but no delays <br /> to traffi are expected. <br /> Phas two of the project, reconstruction of East Broadway between Pearl <br /> Street an Franklin Boulevard, will begin on Tuesday, September 5 and will <br /> continue ntil October 22. Crews will barricade the street beginning at 5 <br /> a.m. on T esday morning, completely closing the project area to through <br /> traffic. Two lanes of traffic will be kept open on Pearl and High Streets; <br /> i <br /> west boun traffic onto Broadway from Franklin Boulevard will be detoured to <br /> Sixth Ave ue. All on-street parking within the project area will be removed <br /> during th reconstruction. <br /> more <br /> I <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.