PUBLIC WORK DEPARTMENT • 858 PEARL • EUGENE, OREGON 97401 <br /> NEWS RELEASE , <br /> ~ September 1989 <br /> ICI <br /> I <br /> CONTACT: ichelle Cahill, Project Manager, 683-6855 <br /> Bob Terrel, Engineering, 687-5382 <br /> From Sand a Gleason, Public Information, 687-5523 <br /> FOR IMMED ATE RELEASE <br /> STREET SIGNALS TO BE SHUT DOWN AT INTERSECTION OF <br /> i VALLEY RIVER DRIVE AND VALLEY RIVER WAY <br /> I <br /> On T ursday, September 7, from 8 a.m. to noon, the signal system at the <br /> intersect on of Valley River Way and Valley River Drive will be shut off as <br /> city of E gene crews run new street signal wires to a temporary pole that <br /> will be 1 Gated at the south west corner of the intersection. The relocation <br /> ~ of the po a and wires will make room to widening the intersection and is part <br /> of the re onstruction project on Valley River Way and Valley River Drive that <br /> j Wildish C rvallis Construction Co. began on September 5. <br /> Flag ers will be at the site to direct traffic during while the signals <br /> are off, ut motorists are ur ed to use caution when enterin the area. <br /> g 9 <br /> Duri g the project, Wildish will reconstruct and widen Valley River Way <br /> from Vall y River Drive to the entrance to Delta Village, will overlay Valley <br /> River Dri a from Valley River Way to Goodpasture Island Road, and will <br /> install a additional turn lane on the Delta Highway off-ramp. The <br /> contracto plans to complete the work by November 30, if weather permits. <br /> i <br /> <br /> t <br /> <br />