New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN 4842 Closeout Form
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2017
>
GJN 4842 Closeout Form
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/5/2017 2:36:12 PM
Creation date
5/5/2017 2:36:11 PM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Admin Documents
PW_Active
Yes
External_View
No
GJN
004842
GL_Project_Number
925814
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />City of Eugene Public Works <br />Closeout Form <br />May 5, 2017 <br />GOOD JOB NUMBER004842 <br />PROJECT NUMBER925814 <br />PROJ / GJN DESCPBM VRW VR Dr Cul-de-sac <br />BudgetExpendituresDifferencePM ActualsAJE adjBJE adj <br />FUND / DESC <br />333 - Transportation SDC 14,000.000.0014,000.0031,723.7431,723.7417,724.00 <br />342 - Pavement Preservation Capital 415,630.00359,350.2356,279.77328,429.95(32,523.74)(88,803.00) <br />343 - 2008 Street Bond 1,603.001,603.46(0.46)0.000.000.00 <br />531 - Stormwater Utility - Capital 400.000.00400.00400.00400.000.00 <br />532 - Wastewater Utility - Capital 400.000.00400.00400.00400.000.00 <br />Totals$432,033.00$360,953.69$71,079.31360,953.690.00(71,079.00) <br />Notes: <br />Warranty/As-built Fee$1,500.00BJE# 93181 <br />Tree'sBJE# <br />Project ManagerDate <br />Principal Civil EngineerDate <br />1. Review funding and expenditures <br />2. Project Manager sign <br />3. Principal Civil Engineer sign <br />4. Forward to PWA <br />
The URL can be used to link to this page
Your browser does not support the video tag.