<br />U.S. DEPARTMENT OF TRANSPORTATION <br />Run Date:09/09/2016Report: FMISD05A <br />FEDERAL HIGHWAY ADMINISTRATION <br />Run Time:18:11:17Page1 of 1 <br />FEDERAL-AID PROJECT AGREEMENT <br />RECIPIENT:FEDERAL PROJECT NO: <br />41-Oregon2385097 <br />RECIPIENT PROJ. NO(S): <br />19746 <br />1. The State through its department of transportation, or other recipient, has complied, or hereby agrees to comply, with the applicable terms and conditions <br />set forth in(a) Title 23, U.S. Code, highways;(b) The regulations issued pursuant thereto, and the policies and procedures promulgated by the <br />Federal Highway Administration; and(c) All other applicable federal laws and regulations.2. The State, or other recipient, stipulates that as a <br />condition to payment of the Federal funds obligated, it accepts and will comply with the provisions set forth in 23 CFR 630.112. These provisions <br />incorporate by reference all other federal laws and regulations pertaining to the project or the activity for which the funds are obligated. Solely for the <br />purposes of emphasis, such applicable provisions include, but are not limited to, the requirements of Appendix A to 2 CFR Part 170Award terms for <br />Reporting subaward and executive compensation information, and 2 CFR 200, including for those funds for which such amount will be subawarded to a <br />subrecipient, 2 CFR 200.331.3. Relative to the above designated project, the FHWA has authorized certain work to proceed as evidenced by the date entered <br />opposite the specific item of work. For such authorized work, the federal funds obligated or advance-construction authorized, are not to exceed the amount <br />shown herein. The balance of the estimated total project cost is an obligation of the State or other direct recipient.4. Such authorization of Federal funds <br />extends only to project costs incurred by the State, or other recipient, following Federal Highway Administrations authorization to proceed with the project. <br />PROJECT TITLE: <br />FRANKLIN BLVD FACILITY PLAN & NEPA DOCUMENTATION (EUGENE) <br />PROJECT DESCRIPTION: <br />Prepare design concepts and NEPA documentation westbound from I-5 to Alder Street <br />DUNS#: <br />809580681 <br />CLASSIFICATION OF PHASE OF WORKEFFECTIVE DATE OF <br />TO BE PUT UNDER AGREEMENTAUTHORIZATION <br />HIGHWAY PLANNING & RESEARCH <br />PRELIMINARY ENGINEERING <br />RIGHT-OF-WAY <br />CONSTRUCTION <br />09/09/2016 <br />OTHER <br />PROGRAMURBAN/TOTAL COSTFEDERALFEDERAL FUNDS UNDER ADVANCED CONST. <br />CODEWITHSHAREAGREEMENTFUNDS <br />L23E$263,843.0289.73%$236,746.34$0.00 <br />L23R$209,799.9889.73%$188,253.52$0.00 <br />TOTAL$473,643.00$424,999.86$0.00 <br />ESTIMATED TOTAL COST: <br />$473,643.00 <br />TOTAL AUTHORIZED FOR PROJECT: <br />$424,999.86 <br />DEPARTMENT OF TRANSPORTATION <br />AVAILABLE FUNDS CERTIFIED BY:Colleen HunterDATE:08/22/2016 <br />APPROVED AND REQUESTED BY:Colleen HunterDATE:08/22/2016 <br />AGRMT/MODIFY REQUESTED BY:Jeffrey FlowersDATE:08/30/2016 <br />FEDERAL HIGHWAY ADMINISTRATION <br />PROJECT INFORMATION REVIEWED BY:Ruth McNameeDATE:09/01/2016 <br />APPROVAL RECOMMENDED BY:Matthew BirdDATE:09/09/2016 <br />APPROVED AND AUTHORIZED BY:Linda SwannDATE:09/09/2016 <br />RECIPIENT REMARKS: <br />PROJECT WILL LOOK AT VARIOUS DESIGN CONCEPTS AND THE NEPA WORK ASSOCIATED WITH <br />THE CONCEPTS. THIS PLANNING WORK WILL THEN PROVIDE THE NEEDED INFORMAITON TO <br />THE CITY TO DETERMINE WITH CONCEPT WILL BE MOVED INTO THE PRELIMINARY DESIGN AND <br />CONSTRUCTION. <br />CFDA#20.205; END DATE 6/30/19; NO ODOT ICAP, LOCAL ICAP APPROVED THROUGH IGA; CH <br />7/20/16 <br />DIVISION REMARKS: <br />This agreement is subject to the following award terms: http://edocket.access.gpo.gov/2010/pdf/2010-22705.pdf <br />and http://edocket.access.gpo.gov/2010/pdf/2010-22706.pdf. <br />