New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4510 Asphalt Maint Assoc Contract
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2008
>
GJN4510 Asphalt Maint Assoc Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/19/2011 10:35:03 AM
Creation date
7/24/2008 3:39:17 PM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Contracts
PW_Active
No
External_View
No
GJN
004510
GL_Project_Number
985354
Identification_Number
2008100485
COE_Contract_Number
2008-00030
Retention_Destruction_Date
9/29/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
STANUtit~u.7rcw~ ....r,.....__ <br /> Oregon Standard Specifications far Construction (Oregon Specifications) as issued in June 2002, <br /> ' 2002 Oregon Standard Drawings (Oregon Drawings), in effect as of April 16, 2007, both as revised <br /> ~ndment #3 and #4 have been adopted as the Standard Specifications and Standard Drawings for <br /> ` ity of Eugene in accordance with City Code section 7.085. Amendment #3 and #4 is hereby made a <br /> of the Standard Specifications and Standard Drawings of the City of Eugene as fully and completely as <br /> ;I :were set forth therein. The Standard Specifications, Standard Drawings and all Addenda may be <br /> ixamined at the Engineering office located at 244 E. Broadway, Eugene, OR 97401.. <br /> SUPPLEMENTAL SPECIFICATIONS <br /> The section, subsection and drawing numbers of the Supplemental Specifications correlate to the section <br /> and subsectian numbers of the 2002 Oregon Standard Specifications and Standard Drawings. <br /> 00110.20 Deflnttions <br /> (REVISE) Revise Work Day Definition ORS reference to ORS187.010 <br /> Op150.15(b) Agency Responsibilities <br /> (ADD) "survey" to the first sentence of third bullet after "The Agency will replace" <br /> 00150.50(c) Contractor's Responsibilities <br /> {REVISE) The last buileted item beginning with "!f the Contractor is delayed" is a new paragraph and <br /> not buileted. <br /> 00150.90(b) Ail Contract Work <br /> (REVISE) The last paragraph to "The date of the Third Notification will be deemed the date of <br /> completion of the Work entitling the Contractor to release of retainage.° <br /> 40170.03 Furnishing Rlght-of-Way and Permits ~ , <br /> {REPLACE) ,The first and second sentences with "For projects performed under contract to the City, the <br /> Agency will obtain and pay for the following when they are required by the applicable Laws or <br /> by Plans or Specifications" <br /> 00170.67 Contractor Fee (Applicable January 1 ~ 2008) <br /> (DELETE) Entire sub-section <br /> 00180.10 Responsibility for Contract <br /> (REVISE) The last sentence of the paragraph beginning with "Action by the Agency under" is a new <br /> paragraph added after the buileted list. <br /> 00180.20(a) General ~ ' <br /> (ADD) "On a project funded bythe Federal HighwayAdministration (FHWA), the Contractor's own <br /> organization shall peroorm Work amounting to. at least 30% of the original Contract Amount." <br /> 00180.40{a) General <br /> (ADD) Third bullet "Not perform work at the project site on a day not defined as a work day . <br /> according to sub-section 110.20." <br /> <br /> Special Specifications Page 1 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.