- - - - _ - <br /> EXPENSE DETAILS - POLK STEET WATER QUALITY VAULT - CE <br /> Milea a Estimate Surve Su lies Estimate <br /> Task Descri lion # Eu ene Tri s" miles # Local Tri s"" miles Cost Task Descri lion Cost • <br /> 1 Preconstruction and ress meetin s 18 180 0 $ 91 <br /> 2 Ins ection 35 350 0 $ 177 <br /> 0 0 $ <br /> 0 p <br /> Total <br /> 0 0 $ <br /> 0 0 $ <br /> Subtotals 530 0 SUrve E ui ment Estimate <br /> Total 530 $ 268 Level $15/day, Total Station $100/day, GPS $500/day <br /> "Eugene Trips are assumed to be 10 miles round trip from OBEC to job site only Task Descri lion Cost <br /> *"Local Trips are assumed to be 10 miles per day, including to/from office, and misc. around the site , <br /> Per Diem Estimate <br /> Total $ _ <br /> Task Descri lion # Ovemites" Cost # Meai Da Cost Cost <br /> N/A $ $ _ $ _ <br /> $ - $ - $ <br /> $ - $ - $ - <br /> Subtotals 0 0 Task Description Cost <br /> Total $ Total $ - $ <br /> "Ovemites are assumed to be 4 rites per week and are charged at $60/Wife <br /> '"`Meals are $39/day and assumed to be 3 per week at 100% and 2 per week at 75% <br /> Total $ - <br /> ~ Re roduction Estimate <br /> Concrete C tinder Testin <br /> Task Descri lion 8.5x11 Co ies Cost M tar Pian Sheets Cost Cost <br /> 1 Pro'ect Coordination 30 $ 3.00 0 $ - $ 3.00 Task Descri lion Cost <br /> 3 • Sho Drawin Reviews 30 $ 3.00 0 $ - $ 3.00 <br /> 4 General Documenatation 100 $ 10.00 0 $ - $ 10.00 <br /> 5 Chan a Order Assistance 50 $ 5.00 0 $ $ 5.00 <br /> 6 onstructe ans 30 $ 3.00 0 $ - $ 3.00 <br /> 7 ina ocumentation 100 $ 10.00 0 $ - $ 10.00 Total $ <br /> $ - 0 $ - $ - <br /> $ - 0 $ - $ - <br /> Subtotals $34.0 $ - <br /> Total $ 34.00 TOTAL OBEC EXPENSES $ 302 <br /> <br /> 'Copies are charged at $0.10/each <br /> <br /> ""Mylar Plan Sheets are charged at $6/ft. <br /> <br />