New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4510 PBS 06.18.08
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2008
>
GJN4510 PBS 06.18.08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/19/2011 10:35:27 AM
Creation date
7/24/2008 2:57:19 PM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Project Budget Summary
PW_Active
No
External_View
No
GJN
004510
GL_Project_Number
985354
Identification_Number
Revised
Retention_Destruction_Date
9/29/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> Run D~: 05/22/2008 16:27:02 City of Eugene <br /> Estimate Distribution <br /> Estimate: Post bid Estimate <br /> Job 93-004510 2008 3LURRY SEAL PROJECT <br /> Line No. Description Quantity Unit Unit Price Amount <br /> 2008 SLURRY SEAL PROJECT <br /> General <br /> 0010. MOBILIZATION 1.00 LUMPSUM $1,000.00 $1,000.00 <br /> 0020. TEMP. WORK ZONE TRAFFIC CONTROL, COMPLETE 1.00 LUMPSUM $23,534.31 $23,534.31 <br /> 0030. EROSION CONTROL 1.00 LUMPSUM $500.00 $500.00 <br /> 0040. SLURRY SEAL 158,500.00 SQYD $1.02 $161,670.00 <br /> 0050. SLURRY SEAL CRACK SEALING 80,000.00 FOOT $0.53 $42,400.00 <br /> 0060. TEMPORARY STRIPING 487.00 FOOT $1.21 $589.27 <br /> 0070. LEVEL 2, 1/2", DENSE HMAC 2.50 TON $568.75 $1,421.88 <br /> 0060. PAVEMENT LINE REMOVAL 643.00 FOOT $4.00 $2,572.00 <br /> 0090. PAVEMENT LINES, STOP BARS & CROSS-WALKS 487.00 SQFT $6.75 $3,287.25 <br /> 0100. PAVEMENT LEGEND REMOVAL 2.00 EACH $190.00 $380.00 <br /> Total General $237,354.71 <br /> Total 2008 SLURRY 3SAL PROJECT $237,354.71 <br /> 2008 SLURRY SEAL PROJECT - Other / Direct <br /> General <br /> 0010. Printing 1.00 LUMPSUM $800.00 $800.00 <br /> 0020. Advertising 1.00 LUMPSUM $500.00 $500.00 <br /> 0030. Contingency 10~ of Contract $23,735.47 <br /> 0040. test 1.00 LUMPSUM $1,200.00 $1,200.00 <br /> Total General $26,235.47 <br /> Total 2008 3LURRY SEAL PROJECT - Other / Direct $26,235.47 <br /> 2008 SLURRY SEAL PROJECT - Miscellaneous <br /> General <br /> 0010. Engineering Charge 1.00 LUMPSUM $52,500.00 $52,500.00 <br /> 0020. AS-CONST. 11MONTH WARRANTY CHARGE 1.00 LUMPSUM $788.00 $788.00 <br /> 0030. PSF REMAINDER OF PROJ (FOR EST) 1.00 LUMPSUM $25,000.00 $25,000.00 <br /> Total General $78,288.00 <br /> Total 2008 3LURRY SEAL PROJECT - Miscellaneous $78,288.00 <br /> Total Post bid Estimate $341,878.18 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.