Run Date: 04/23/2008 14:36:26 City of Eugene <br /> Engineer's Estimate <br /> Estimate: post bid - H&J <br /> Job 93-004527 6th Alley Between Tyler 6 Polk 7~~/ <br /> Line No. Description Quantity Unit Unit Price Amount <br /> 6th Alley Between Tyler 6 Polk <br /> General <br /> 0010. MOBILIZATION 1.00 LUMPSUM $10,000.00 $10,000.00 <br /> <br /> I 0020. TEMP. PROTECTION AND DIRECTION OF TRAFFIC 1.00 LUMPSUM $4,000.00 $4,000.00 <br /> 0030. EROSION CONTROL 1.00 LUMPSUM $650.00 $650.00 <br /> 0040. 8 IN. SUBGRADE STABILIZATION 154.00 SQYD $16.25 $2,502.50 <br /> 0050. 72 INCH SADDLE MANHOLE OVER EX PIPE 1.00 EACH $5,000.00 $5,000.00 <br /> 0060. CATCH BASINS 1.00 EACH $1,345.00 $1,345.00 <br /> 0070. MINOR ADJUSTMENT OF MANHOLES 1.00 EACH $300.00 $300.00 <br /> 0080. GENERAL EXCAVATION 205.00 CUYD $10.00 $2,050.00 <br /> 0090. 12 INCH PVC STORM PIPE 168.00 FOOT $48.00 $8,064.00 <br /> 0100. 10 INCH PVC STORM PIPE 11.00 FOOT $48.00 $528.00 <br /> 0110. 8 INCH PVC WASTEWATER PIPE 367.00 FOOT $57.00 $20,919.00 <br /> 0120. 6 INCH WASTEWATER SERVICE LINE 56.00 FOOT $40.00 $2,240.00 <br /> 0130. WATER QUALITY STRUCTURE 1.00 EACH $9,700.00 $9,700.00 <br /> 0140. LEVEL 2 1/2 INCH DENSE, HMAC MIXTURE 25.00 TON $150.00 $3,750.00 <br /> 0150. PLAIN CONCRETE PVMT, UNDOWELED, 7 IN. THICK 5,164.00 SQFT $5.60 $28,918.40 <br /> 0160. TOPSOIL 1.50 CUYD $100.00 $150.00 <br /> Total General <br /> Total 6th Alley Between Tyler ~ Polk $100,116.90 <br /> 6th Alley Between Tyler b Polk - Other / Direct <br /> General <br /> 0010. Permits LUMPSUM $0.00 <br /> 0020. CONTINGENCY 10~ of Contract $10,011.69 <br /> 0030. Advertising 1.00 LUMPSUM $600.00 $600.00 <br /> 0040. test 1.00 LUMPSUM $1,200.00 $1,200.00 <br /> Total General $11,811.69 <br /> Total 6th Alley Between Tyler 6 Polk - Other / Direct $11,811.69 <br /> 6th Alley Between Tyler 6 Polk - Miscellaneous <br /> General <br /> 0010. Engineering Charge 43~ of Direct $48,129.29 <br /> 0020. Construction Financing 3.51198 of Direct $3,930.91 <br /> 0030. Finance Admin Fee 5~ of Direct $5,596.43 <br /> Total General $57,656.63 <br /> Total 6th Alley Between Tyler & Polk - Miscellaneous $57,656.63 <br /> Total post bid - H&J $169,585.22 <br /> <br />