Run Date: 9/10/2008 Page 1
<br /> City of Eugene
<br /> Hid Tabulation
<br /> 2008-000010
<br /> Job No. 93-009527
<br /> Concrete Paving, Wastewater, and Stormwater Systems on 6th Alley from Tyler Street to Polk Street
<br /> Engineer's Estimate N & J Construction 2G Construction Brown Contracting Euoene Sand Construction
<br /> Line
<br />
<br /> N~,_ Description u ntit Oni Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount
<br /> 10 MOBILIZATION 1 LUMPSUM $11,500.00 $11,500.00 $10,000.00 $10,000.00 $11,601.95 $11,601.95 $5,000.00 $5,000.00 $10,800.00
<br /> $10,800.00
<br /> 20 TEMP. PROTECTION AND DIRECTION OF TRAFFIC 1 LOMPSUM $7,S00.OD $7,500.00 $4,000.00 $9,000.00 $2,671.00 $2,671.00 $500.00 $500.00
<br /> $2,000.00 $2,000.00
<br /> 30 EROSION CONTROL 1 LUMPSUM $600.00 $600.00 $650.00 $650.00 $1,178.D0 $1,178.00 $200.00 $200.00 $900.00 $900.00
<br /> 40 8 IN. SUBGRADE STABILIZATION 154 SQYD $13.00 $2,002.00 $16.25 $2,502.50 $20.56 $3,166.24 $40,00 $6,160.00 $14.00 $2,156.00
<br /> 50 72 INCH SADDLE MANHOLE OVER EX PIPE 1 EACH $8,500.00 $8,500.00 $5,000.00 $5,000.00 $4,550.00 $9,550.00 $8,000,00 $8,000.00 $5,200.00 $5,200.0
<br />
<br /> 60 CATCH BASINS 1 EACH $2,000.00 $2,000.00 $1,395.00 $1,345.00 $734.00 $734.00 $1,200.00 $1,200.00 $1,300.00 $1,300.00
<br /> 70 MINOR ADJUSTMENT OF MANHOLES 1 EACH $400.00 $900.00 $300.00 $300.00 $132.00 $132.00 $275.00 $275.00 $630.00 $630.00
<br /> 80 GENERAL EXCAVATION 205 CUYD $30.00 $6,150.00 $10.00 $2,050.00 $35.50 $7,277.50 $50,00 $10,250.00 $95.00 $9,225.00
<br /> 90 12 INCH PVC STORM PIPE 168 FOOT $95.00 $7,560.00 $98.00 $8,064,00 $99.69 $8,397.92 $98,00 $8,069.00 $68.00 $11,424.00
<br /> 100 10 INCH PVC STORM PIPE 11 FOOT $42.00 $962.00 $48.00 $528.00 $90.14 $991.59 $73.00 $803.00 $48.00 $528.00
<br /> 110 8 INCH PVC WASTEWATER PIPE 367 FOOT $55.00 $20,185.00 $57.00 $20,919,00 $36.82 $13,512.99 $36.00 $13,212.00 $57.00
<br /> $20,919.00
<br /> 120 6 INCH WASTEWATER SERVICE LINE 56 FOOT $45.00 $2,520.00 $40.00 $2,290.00 $56.69 $3,179.69 $60.00 $3,360.00 $56.00 $3,136.00
<br /> 130 WATER QUALITY STRUCTURE 1 EACH $15,000.00 $15,000.00 $9,700.00 $9,700,00 $11,677.00 $11,677.00 $12,500.00 $12,500.00 $7,800.00 $7,800.00
<br /> 140 LEVEL 2 1/2 INCH DENSE, HMAC MIXTURE 25 TON $85.00 $2,125.00 $150.00 $3,750,00 $220.26 $5,506.50 $215.00 $5,375.0D $15D.0D $3,750.00
<br /> 150 PLAIN CONCRETE PVMT, UNDOWELED, 7 IN. THICK 5169 SQFT $9.00 $46,476.00 $5.60 $28,918.90 $9.97 $25,665.08 $6.50 $33,566.00
<br /> $5.65 $29,176.60
<br /> 160 TOPSOIL 1.5 CUYD $30.00 $45.00 $100.00 $150.00 $119.00 $171.00 $220.00 $330.00 $200.00 $300.00
<br /> ToT~+~ $133,025.00 $100,116.90 $100,357.31 $106,795.00 $109,244.60