Billable Project Costs As Of 04/30/2008 ~ <br /> Q5114120(I$ 4:4:49 PM r= Page 2 of <br /> - - <br /> - _ <br /> - <br /> Project Billed Acti- Total Amount Billed <br /> Billed By vi TranDate TranId Resource Bmploved uantit Amount Transaction Remark ~ <br /> 0402 Mix Design Verification (no fees assoc) $1,205.00 $1,205.00 <br /> 3636213 Materials Testine 1 ZO5.00 1 205.00 <br /> 285C Base aggregates quality control (CE) $805.00 $805.00 <br /> 04/29/2008 T6563093 Engineering Technician 2 5.5 L-H $385.00 MIX DESIGN AGG SEPARATION <br /> 04/30/2008 T656301 l4 Engineering Technician 2 1 L-H $70.00 MIX DESIGN AGG SEPARATION <br /> 04/30/2008 T6563094 Engineering Technician 2 5 L-H $350.00 MIX DESIGN AGG SEPARATION <br /> 302C Miz design (CE) $400.00 $400.00 <br /> 04/28/2008 TI374072 Engineering Associate 2 L-H $(60.00 KNIFE RIVER MDC DESIGN <br /> 04/30/2008 T1374074 Engineering Associate 3 L-H $240.00 KNIFE RIVER MIX DESIGN <br /> <br /> v <br /> <br />